Differences between revisions 9 and 10
Revision 9 as of 2020-04-30 10:52:26
Size: 1120
Comment:
Revision 10 as of 2020-04-30 11:02:27
Size: 1346
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * KAGRA
 * System
 * KAGRA(Miyakawa)
 * System(Miyakawa)
Line 24: Line 24:
 * Sampling  * Sampling(Yamamoto)
Line 28: Line 28:
 * Control  * Control(Oshino)
Line 32: Line 32:
 * DAQ  * DAQ(Oshino)
Line 38: Line 38:
 * Data monitor system  * Data monitor system(Oshino)
Line 43: Line 43:
 * Timing  * Timing(Yamamoto)
Line 49: Line 49:

 * Conclusion(Miyakawa)
Line 56: Line 58:
 * Short author? Full author? -> CPC
 * Due date: 1month later
 * Document sharing system -> Yamamoto asks Shinkai-san for overleaf

2020/4/30 10:00~ DGS meeting for paper

  • Miyakawa, Yamamoto, Oshino


Target paper

  • LIGO-P2000107: Software X
  • Computer related
  • Physics for timing: CQG?

Contents

  • KAGRA(Miyakawa)
  • System(Miyakawa)
    • 3km observatory
    • Real time OS
      • IO chassis
      • ADC/DAC
    • RFM, Dolphin
    • EPICS
    • Timing
    • General network
    • Control room (client)
  • Sampling(Yamamoto)
    • Rate
    • AA/AI ->

  • Control(Oshino)
    • Real time models, connected by RFM and Dolphin
    • Transfer function
  • DAQ(Oshino)
    • Historical
    • Data streaming
    • Data amount
      • Transfer speed from each RTPC
  • Data monitor system(Oshino)
    • software(dataviewr, DTT, StripTool. ndscope)

    • Response to user request -> client

  • Timing(Yamamoto)
    • Difference from GPS time
      • Offset ~200ns
    • Delay from master to slave (~15ns)
    • Delay from timing slave to IOP model (1PPS sampled at 960Hz)
    • Time stamp at data concentrator
  • Conclusion(Miyakawa)


Action items

  • 1paper or 2papers? or series?
  • Short author? Full author? -> CPC

  • Due date: 1month later
  • Document sharing system -> Yamamoto asks Shinkai-san for overleaf

KAGRA/Subgroups/DGS/Meeting/20200430/minute (last edited 2020-04-30 11:02:27 by OsamuMiyakawa)