Differences between revisions 69 and 70
Revision 69 as of 2018-11-15 15:46:35
Size: 1243
Editor: KousekiMiyo
Comment:
Revision 70 as of 2018-11-15 15:46:45
Size: 1238
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
     Two vacuum systems have been constructed. One of two interferometer (X arm) is initially constructed. Two vacuum systems have been constructed. One of two interferometer (X arm) is initially constructed.

Geophysics Interferometer

Link

Sub System

Analysis

Tools

GIF JGWdoc Tree

Strainmeter

Usefull Parameters

DAQ Monitor

KAGRA log

Environmental Sensors

CARM Stabilization

Gotic2

Earthquake(USGS)

Data Acquisition

Earthquake Warning

Frequency Stabilized Laser

Remote Control

Definition and scope

  1. Construction of two fixed-mirror interferometers (1.5km x 2) along KAGRA, for both geophysical observation and KAGRA baseline monitor.

Two vacuum systems have been constructed. One of two interferometer (X arm) is initially constructed.

  1. Arrangement of environment sensors for monitoring the tunnel, rooms, and instruments.

KAGRA/Subgroups/GIF (last edited 2024-04-02 09:53:34 by AkiteruTakamori)