Line 1: Line 1:
 * tube beam dump https://dcc.ligo.org/DocDB/0105/D1300548/001/D1300548%20Beam%20Dump%2C%20Fast%20Shutter%2C%20HAM1%2C%20aLIGO.PDF
 * OFI shroud https://dcc.ligo.org/DocDB/0151/D1800103/006/D1800103-v6.PDF
= High power beam dump =

== Meeting log ==
 * [[KAGRA/Subgroups/IOO/Meeting/Memo20200703dump|2020.07.03]]
 * [[KAGRA/Subgroups/IOO/Meeting/Meeting20181114dump|2018.11.14]]
 * [[KAGRA/Subgroups/IOO/Meeting/Meeting20181101dump|2018.11.1]]
 * [[KAGRA/Subgroups/IOO/Meeting/Meeting20181025dump|2018.10.25]]
 * [[KAGRA/Subgroups/IOO/Meeting/Meeting20181016dump|2018.10.16]]
 * [[KAGRA/Subgroups/IOO/Meeting/Meeting20180824|2018.8.24]]
 * [[KAGRA/Subgroups/IOO/Meeting/Meeting20180821|2018.8.21]]
 * [[KAGRA/Subgroups/IOO/Meeting/Meeting20180817|2018.8.17]]


== Design documents ==

== Related klogs ==
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7676|Assembly]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7707|Test in PSL room]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7606|Capper flange installation]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7912|Installation]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8303|Initial PRM (mis)alignment to the dump]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9035|DGS]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8538|High power test]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9226|Thermal conductivity]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=11823|Circuit problem]]



== List of other documents ==