Differences between revisions 5 and 6
Revision 5 as of 2018-01-15 10:55:58
Size: 310
Comment:
Revision 6 as of 2018-01-16 18:49:41
Size: 1956
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
Kokeyama, Izumi, Nakano, Somiya, Uehara, Moriwaki, Matsushima, Yamamoto, Ono, Doi,Kanbara, Yokogawa, Kitazawa, Sakamoto, Yoshioka, Miyata, Sawada,
Line 6: Line 7:
 * Those who still don't have the klog account should make contact to Raffaele of NAOJ via an email.
 * Somiya-san presented the status and plans for the OMC.
 
   * A critical point for now: they don't have an OSTM mirror in hand. There are two choices: one is to get a 2 inch mirror, the other is to get a substrate from the MIR group and get it polished. If we use a 6 cm thickness mirror from MIR, the thickness might be a problem although it shouldn't clip the beam in theory.

   * Wiring is not done at all at the moment.

   * the thickness of the aluminum breadboard is set such that the weight is identical to that for the silica breadboard.
 
   * LEX-ZERO has a small thermal expansion coefficient. Actually smaller than invar. Out gassing was measured by an outside company.
    
   * The range of the PZT should be large enough if the temperature swings within +/- 0.3 deg.
   
   * A wrong side of the bottom surface was polished for OBS1. This was fixed by polishing the correct side by an outside company.

   * OBS3 needs to be out when adjusting the angle of OMC2 by a micrometer.

   * RF DARM will be extracted from the diode in transmission of OSTM. Also, WFSs are from the same place.

   * The suspension cage can have actuators, but currently they are not planning to attach the actuators.

   * If the aluminum OMC is good enough, it can stay as a final component in chamber, as opposed to the silica one.

   * No QPD will be placed behind OMMT1.

Monday Meeting 0115

Participants

Kokeyama, Izumi, Nakano, Somiya, Uehara, Moriwaki, Matsushima, Yamamoto, Ono, Doi,Kanbara, Yokogawa, Kitazawa, Sakamoto, Yoshioka, Miyata, Sawada,

Updates from projects

  • Those who still don't have the klog account should make contact to Raffaele of NAOJ via an email.
  • Somiya-san presented the status and plans for the OMC.
    • A critical point for now: they don't have an OSTM mirror in hand. There are two choices: one is to get a 2 inch mirror, the other is to get a substrate from the MIR group and get it polished. If we use a 6 cm thickness mirror from MIR, the thickness might be a problem although it shouldn't clip the beam in theory.
    • Wiring is not done at all at the moment.
    • the thickness of the aluminum breadboard is set such that the weight is identical to that for the silica breadboard.
    • LEX-ZERO has a small thermal expansion coefficient. Actually smaller than invar. Out gassing was measured by an outside company.
    • The range of the PZT should be large enough if the temperature swings within +/- 0.3 deg.
    • A wrong side of the bottom surface was polished for OBS1. This was fixed by polishing the correct side by an outside company.
    • OBS3 needs to be out when adjusting the angle of OMC2 by a micrometer.
    • RF DARM will be extracted from the diode in transmission of OSTM. Also, WFSs are from the same place.
    • The suspension cage can have actuators, but currently they are not planning to attach the actuators.
    • If the aluminum OMC is good enough, it can stay as a final component in chamber, as opposed to the silica one.
    • No QPD will be placed behind OMMT1.

Plan for this week

  • 1/16 Tue ISS work in Kamioka
  • 1/17-20 NiigataU Nogai-kun visit

Topic of this week

OMC report (Somiya)