Differences between revisions 11 and 12
Revision 11 as of 2019-01-15 10:19:53
Size: 937
Comment:
Revision 12 as of 2019-01-15 13:24:50
Size: 975
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Sato, Fujikawa, Nakano, Ge, Kokeyama

IOO meeting 2019 0115

Connection

Zoom3: https://zoom.us/j/5045179604

Participants

Sato, Fujikawa, Nakano, Ge, Kokeyama

Announcements

  • 共同利用申請書 (IOO topics: Niigata U, Titech, Toyama U)
  • MZM will not be used in O3, technical review on Jan 22 (Tue) in the commissioning meeting slot
  • registration for KIW
  • JPS abstract submission 21st Jan
  • Nakano-san obtained PhD!
  • Yamakoh master thesis defense today

Recent Status

PSL

  • Ready for the high power
  • MZM will be broken

IMC

  • Mirror cleaning with first contacts are done, thanks to Hirose-san
  • In-air alignment was done, ready for the evacuation
  • Finesse measurement
  • Angular control

MZM

  • Rigid pedestal will be tested

Beam Dump

  • IMMT shields were installed
  • Waiting for the V-shape beam dump parts

OMC, OMMT, OSTM

Visitor

  • Guiguo will be away Jan 22 Feb 10

KAGRA/Subgroups/IOO/Meeting/Meeting20190115 (last edited 2019-01-15 13:33:56 by KeikoKokeyama)