Differences between revisions 3 and 4
Revision 3 as of 2017-08-28 13:12:41
Size: 93
Comment:
Revision 4 as of 2017-09-12 10:40:27
Size: 368
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
== October ==
=== 10/2-10/6 ===
 * IMMT1,2 敷板入れ、固定 - Koach filter 必要
 * IMM-PRM ダクト締結
 * ISS

=== Later in Oct? ===
 * Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)
Line 6: Line 15:
AC in the PSL room  * AC installation in the PSL room

Schedule 2017 Oct - Dec

October

10/2-10/6

  • IMMT1,2 敷板入れ、固定 - Koach filter 必要
  • IMM-PRM ダクト締結
  • ISS

Later in Oct?

  • Green beam PSL install - Phase-1後の8月までにはすべてを準備する (ITM1つめ最速8月)

December

  • AC installation in the PSL room

KAGRA/Subgroups/IOO/scheduleLastHalf (last edited 2018-02-07 09:29:53 by KeikoKokeyama)