Date: 2016/3/3
Line 3: Line 4:

Date: 2016/3/3
Line 13: Line 12:
 * Setup COACH filters near the PR3 chamber
 * Setup COACH filters near the PR2 chamber
 * Setup KOACH filters near the PR3 chamber
 * Setup KOACH filters near the PR2 chamber
Line 21: Line 20:
  * Declare the laser hazard area. Distribute laser goggles to people in the center area    * Declare the laser hazard area. Distribute laser goggles to people in the center area
Line 23: Line 22:
 * Measure the beam profile in front of PR2 using the middle size beam profiler   * Measure the beam profile in front of PR2 using the middle size beam profiler
Line 26: Line 25:
 * Declare the finish of the laser hazard   * Declare the finish of the laser hazard
Line 28: Line 27:
 * Stop COACH filters  * Cleaning around the chambers
* Stop KOACH filters
Line 35: Line 35:
 * Two PHS phones for communication between PR and BS area clean booths (or transceivers)  * Two PHS phones for communication between PR and BS area clean booths (or transceivers)
 * Two sets of floor KOACH
 * Clean suits and inner ware
  * Chamber compatible type
 * A wrench to turn the bolts for the flanges
 * A PC (or two) for controlling the picomotor (check with Kokeyama-san ?)
  * Prepare a joypad as a backup (need to find one)
 * A lot of laser goggles (collect them beforehand)
 * Sensor cards (check with IOO people)
 * IR viewer (check with IOO people)<<BR>>

=== Notes ===
 * Divide the team of 5 into 2-2-1 (PR area - BS area - outside the clean booths)
 * Who will operate the MC ?

iKAGRA PR2 alignment & Beam Profile Measurements

Date: 2016/3/3

Workers: Michimura,Ushiba,Furuhata,Kambara, Aso

Objectives

  • Center the beams on PR2 and PR3 mirrors
  • Measure the beam profile in front of PR2 and PR3

Procedure

  • Enter the tunnel, check necessary tools
  • Setup KOACH filters near the PR3 chamber
  • Setup KOACH filters near the PR2 chamber
  • Open the flange of PR3 (on the +X side)
  • Open the flange of PR2 (both -X and +X sides)
  • Lock the MC and send the beam from IMMT2 to PR2 with low power (<2mW)

  • Center the beam on PR2 using IMMT2 picomotors
  • Center the beam on PR3 using PR3 picomotors
  • If the beam on PR3 is too dim and difficult to align
    • Declare the laser hazard area. Distribute laser goggles to people in the center area
    • Increase the power from MC (to 25mW or so)
  • Measure the beam profile in front of PR2 using the middle size beam profiler
  • Measure the beam profile in front of PR3 using the large beam profiler
  • Stop the beam from MC
  • Declare the finish of the laser hazard
  • Close the flanges
  • Cleaning around the chambers
  • Stop KOACH filters

Necessary items, tools

  • Middle size beam profiler (check with Doi-san)
    • A stand to hold it at the right height
  • Large size beam profiler (need to find where)
    • A height adjustable table (check with Saito-san)
  • Two PHS phones for communication between PR and BS area clean booths (or transceivers)
  • Two sets of floor KOACH
  • Clean suits and inner ware
    • Chamber compatible type
  • A wrench to turn the bolts for the flanges
  • A PC (or two) for controlling the picomotor (check with Kokeyama-san ?)
    • Prepare a joypad as a backup (need to find one)
  • A lot of laser goggles (collect them beforehand)
  • Sensor cards (check with IOO people)
  • IR viewer (check with IOO people)

Notes

  • Divide the team of 5 into 2-2-1 (PR area - BS area - outside the clean booths)
  • Who will operate the MC ?

KAGRA/Subgroups/MIF/Commissioning/PR2Alignment (last edited 2016-03-03 01:20:48 by YutaMichimura)