KAGRA/Subgroups/MIF/PDVacについて、ここに記述してください。 = Vacuum Enclosure & Wiring for In-Vac PDs =
{{{

Some of the core PDs and QPDs have to be placed inside the vacuum. Those PDs will be put in hermetic enclosures. The wires used to communicate with those PDs have to be also vacuum compatible.

The tasks are:

 * Design the airtight enclosures
 * Make sure that the heat can escape from the PD.
 * Chose appropriate (vacuum compatible) wires for signal and power transmission.

}}}

== 具体的な目標 ==
近場では、12月中旬のプロトタイプ1号納品を目指す。

== Action Items ==
A/I化できたものについてリストしておく
|| '''AI_MIF_INVACPD#''' || '''Progress'''|| '''Description''' ||
|| 001 仕様の確認|| ||設計上のdetailをLIGOに確認。どこで真空シールしてるのか?など。||
|| 002 製作方法の確保|| ||NAOJ-ATC/MEかどこかに製作をかけあう。予算はKAGRAからださないといけない可能性あり。||
|| 003 図面の作成、レビュー|| || 回路上のPDの位置やレギュレータ、コネクタの位置によって外箱にあける穴の位置がかわるように見えるので、そのdetailを反映した図面を、製作してもらうところにつくってもらう→みんなでレビュー||
||004 発注作業 || || ||

== LIGO Link(s) ==
 * [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=73663|LIGO-D1101992]]

== External Links ==
 * [[http://outgassing.nasa.gov/|NASA's outgassing data]]
 * [[http://esmat.esa.int/Services/outgassing_data/outgassing_data.html|ESA's outgassing data]]
 * [[http://matdb.jaxa.jp/Outgas/Outgasdoc1_j.html|JAXA's outgassing data]]
 * [[http://matdb.jaxa.jp/main_j.html|JAXA's material data]]

Vacuum Enclosure & Wiring for In-Vac PDs

Some of the core PDs and QPDs have to be placed inside the vacuum. Those PDs will be put in hermetic enclosures. The wires used to communicate with those PDs have to be also vacuum compatible.

The tasks are:

 * Design the airtight enclosures
 * Make sure that the heat can escape from the PD.
 * Chose appropriate (vacuum compatible) wires for signal and power transmission.

具体的な目標

近場では、12月中旬のプロトタイプ1号納品を目指す。

Action Items

A/I化できたものについてリストしておく

AI_MIF_INVACPD#

Progress

Description

001 仕様の確認

設計上のdetailをLIGOに確認。どこで真空シールしてるのか?など。

002 製作方法の確保

NAOJ-ATC/MEかどこかに製作をかけあう。予算はKAGRAからださないといけない可能性あり。

003 図面の作成、レビュー

回路上のPDの位置やレギュレータ、コネクタの位置によって外箱にあける穴の位置がかわるように見えるので、そのdetailを反映した図面を、製作してもらうところにつくってもらう→みんなでレビュー

004 発注作業

LIGO Link(s)