== Possible Scenarios of Emergencies ==

Instrument Control Working Group

The scope of this WG.

Implement the followings:

  • Remote monitor of instruments deployed throughout the site.
  • Remote manipulation of the instruments
  • Automatic sequential control of the instruments in response to emergency situations.

資料

List of instruments to be controlled

Subsystem

Name

Model

Interface

Location

Quantity

Priority

Vac

Gate Valve

7

Mid

VIS

Suspension Watchdog

Analog Voltage, Relay Switches

Every suspension

11

High

Cryo

Temp. Monitor

RS-232C

Every Cryostat

8

Low

Laser

LD Current Monitor

Analog Voltage

4

High

Possible Scenarios of Emergencies