Differences between revisions 1 and 64 (spanning 63 versions)
Revision 1 as of 2011-02-10 14:59:23
Size: 97
Editor: YoichiAso
Comment:
Revision 64 as of 2022-10-26 08:40:33
Size: 2080
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
## page was renamed from LCGT/subgroup/ifo/MIF
Line 2: Line 3:
This is a Wiki page for Main Interferometer Subsystem (MIF). ||'''Beaurocracy''' ||||<style="text-align:center">'''Interferometer''' ||'''Others''' ||'''Old pages''' ||
||[[LCGT/subgroup/ifo/ISC/Meetings|Meetings]] ||[[LCGT/subgroup/ifo/MIF/OptLayout|Optical Layout]] ||[[KAGRA/Subgroups/IOO/OutputTables|Output Tables]] ||[[KAGRA/wishlist|Wish list]]||[[KAGRA/Subgroups/MIF/Commissioning|Commissioning]] ||
||[[KAGRA/Subgroups/MIF/Members|Members]] ||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]] ||[[KAGRA/Subgroups/MIF/AEL|Analog Electronics]] ||[[KAGRA/Subgroups/MIF/StudentsTopics|Students topics]]||[[LCGT/subgroup/ifo/MIF/HotIssues|Hot Issues]] ||
||[[KAGRA/Subgroups/MIF/TaskList|Task List]] ||[[KAGRA/Subgroups/IOO/OptParam|IOO Parameters]] ||[[KAGRA/ElectronicEquipments|Electronic Equipments]] || ||[[LCGT/subgroup/ifo/ISC|ISC page]] ||
||[[https://docs.google.com/spreadsheets/d/15m5sC_4vChWjNmXxGdSC8POoUBeRn6tSnR1mKuBoFdM|Budget]] ||[[KAGRA/Subgroups/IOO/ALS|Arm Length Stabilization]] ||[[KAGRA/RemoteDesktop|Remote Desktop]] || ||[[KAGRA/Subgroups/MIF/GreenLock|Lock Acquisition]] ||
||[[MIFInterfaces|Interfaces]] ||[[KAGRA/Subgroups/MIF/NoiseBudget|Noise Budget]] ||[[KAGRA/Subgroups/MIF/O4CommissioningTaskList|O4 Task List]] || ||[[KAGRA/Subgroups/MIF/PLC|PLC (Instrument Control)]]||
||[[KAGRA/Subgroups/MIF/ExternalReview2021|External Review]]||[[KAGRA/Subgroups/MIF/Simulation|Simulation]] ||[[KAGRA/Subgroups/MIF/OpticalCharacterization|Optical Characterization]] || || ||
|| || [[KAGRA/Subgroups/MIF/AngularSensing|ASC]]|| || || ||


== Subsystem Definition ==
This subsystem is the main interferometer part of LCGT. The MIF consists of PRC, BS, Arm cavities and SRC. OMC is at the interface between the MIF and the Output Optics group.

This working group's task is to set the optical parameters of the MIF (except for the ones set by the detector configuration group) and design the sensing and control scheme for the length and alignment. We are also responsible for maintaining the detailed optical layout.

Main Interferometer Subsystem

Beaurocracy

Interferometer

Others

Old pages

Meetings

Optical Layout

Output Tables

Wish list

Commissioning

Members

Optical Parameters

Analog Electronics

Students topics

Hot Issues

Task List

IOO Parameters

Electronic Equipments

ISC page

Budget

Arm Length Stabilization

Remote Desktop

Lock Acquisition

Interfaces

Noise Budget

O4 Task List

PLC (Instrument Control)

External Review

Simulation

Optical Characterization

ASC

Subsystem Definition

This subsystem is the main interferometer part of LCGT. The MIF consists of PRC, BS, Arm cavities and SRC. OMC is at the interface between the MIF and the Output Optics group.

This working group's task is to set the optical parameters of the MIF (except for the ones set by the detector configuration group) and design the sensing and control scheme for the length and alignment. We are also responsible for maintaining the detailed optical layout.

KAGRA/Subgroups/MIF (last edited 2022-10-26 08:40:33 by KeikoKokeyama)