Differences between revisions 13 and 14
Revision 13 as of 2012-05-07 23:29:36
Size: 1411
Comment:
Revision 14 as of 2012-05-07 23:32:04
Size: 637
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
 *[[attachment:BBPD_DCresponse.pdf]]
 *[[attachment:BBPD_PCB.pdf]]
 *[[attachment:BroadbandPD.pdf]]
 *[[attachment:D060572-B3.pdf]]
 *[[attachment:D1001974_SCH_V3.pdf]]
 *[[attachment:D1002106-v5 aLIGO ISC QPD MOUNT ASSEMBLY.pdf]]
 *[[attachment:D1100521_v1.pdf]]
 *[[attachment:D1101124_v5.pdf]]
 *[[attachment:D1101614 ASC RFPD.pdf]]
 *[[attachment:ISC_Detectors.pdf]]
 *[[attachment:JJAP-40-426.pdf]]
 *[[attachment:PD_response.pdf]]
 *[[attachment:PD_response_DC.pdf]]
 *[[attachment:QPD_kapton_D1002602_v5.pdf]]
 *[[attachment:RFPD_response_revised_111017.pdf]]
 *[[attachment:RFPD_test.pdf]]
 *[[attachment:RFsignalchain.pdf]]
 *[[attachment:T1100402_RFPDdesign.pdf]]
 *[[attachment:WFS_Interface_v1.pdf]]
 *[[attachment:grote.pdf]]
 *[[attachment:noise_BBPD.pdf]]
== Link ==
||[[

Main Interferometer Subsystem

This is a Wiki page for Main Interferometer Subsystem (MIF).

Subsystem Definition

This subsystem is the main interferometer part of LCGT. The MIF consists of PRC, BS, Arm cavities and SRC. OMC is at the interface between the MIF and the Output Optics group.

This working group's task is to set the optical parameters of the MIF (except for the ones set by the detector configuration group) and design the sensing and control scheme for the length and alignment. We are also responsible for maintaining the detailed optical layout.

||[[

KAGRA/Subgroups/MIF (last edited 2022-10-26 08:40:33 by KeikoKokeyama)