Differences between revisions 24 and 25
Revision 24 as of 2012-06-09 22:13:17
Size: 1156
Editor: YoichiAso
Comment:
Revision 25 as of 2012-07-06 21:34:35
Size: 1239
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
Line 6: Line 7:
Line 8: Line 10:
This subsystem is the main interferometer part of LCGT. The MIF consists of PRC, BS, Arm cavities and SRC.
OMC is at the interface between the MIF and the Output Optics group.
This subsystem is the main interferometer part of LCGT. The MIF consists of PRC, BS, Arm cavities and SRC. OMC is at the interface between the MIF and the Output Optics group.
Line 14: Line 15:
||[[LCGT/subgroup/ifo/ISC/Meetings|Meetings]]||[[LCGT/subgroup/ifo/MIF/HotIssues|Hot Issues]]||[[LCGT/subgroup/ifo/MIF/Commissioning|Commissioning]]||
||[[LCGT/subgroup/ifo/ISC|ISC page]]||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[InstrumentControl|Instrument Control]]||
||[[LCGT/subgroup/ifo/MIF/OptLayout|Optical Layout]]||[[LCGT/SVN|SVN]]||[[LCGT/subgroup/ifo/ISC/TaskList/LockAcquisition|Lock Acquisition]]||
||[[LCGT/subgroup/ifo/MIF/RFPD|RF PD]]||||||
||[[LCGT/subgroup/ifo/ISC/Meetings|Meetings]] ||[[LCGT/subgroup/ifo/MIF/HotIssues|Hot Issues]] ||[[LCGT/subgroup/ifo/MIF/Commissioning|Commissioning]] ||
||[[LCGT/subgroup/ifo/ISC|ISC page]] ||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]] ||[[InstrumentControl|Instrument Control]] ||
||[[LCGT/subgroup/ifo/MIF/OptLayout|Optical Layout]] ||[[LCGT/SVN|SVN]] ||[[LCGT/subgroup/ifo/ISC/TaskList/LockAcquisition|Lock Acquisition]] ||
||[[LCGT/subgroup/ifo/MIF/RFPD|RF PD]] ||<style="text-align:center">[[KAGRA/Subgroups/MIF/TaskList|Task List]]|| ||

Main Interferometer Subsystem

This is a Wiki page for Main Interferometer Subsystem (MIF).



Subsystem Definition

This subsystem is the main interferometer part of LCGT. The MIF consists of PRC, BS, Arm cavities and SRC. OMC is at the interface between the MIF and the Output Optics group.

This working group's task is to set the optical parameters of the MIF (except for the ones set by the detector configuration group) and design the sensing and control scheme for the length and alignment. We are also responsible for maintaining the detailed optical layout.

Meetings

Hot Issues

Commissioning

ISC page

Optical Parameters

Instrument Control

Optical Layout

SVN

Lock Acquisition

RF PD

Task List

KAGRA/Subgroups/MIF (last edited 2022-10-26 08:40:33 by KeikoKokeyama)