Differences between revisions 26 and 27
Revision 26 as of 2012-07-06 21:35:48
Size: 1213
Editor: YoichiAso
Comment:
Revision 27 as of 2012-08-03 15:04:59
Size: 1211
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
||[[LCGT/subgroup/ifo/ISC/Meetings|Meetings]] ||[[LCGT/subgroup/ifo/MIF/HotIssues|Hot Issues]] ||[[LCGT/subgroup/ifo/MIF/Commissioning|Commissioning]] || ||[[LCGT/subgroup/ifo/ISC/Meetings|Meetings]] ||[[LCGT/subgroup/ifo/MIF/HotIssues|Hot Issues]] ||[[KAGRA/Subgroups/MIF/Commissioning|Commissioning]] ||

Main Interferometer Subsystem

This is a Wiki page for Main Interferometer Subsystem (MIF).



Subsystem Definition

This subsystem is the main interferometer part of LCGT. The MIF consists of PRC, BS, Arm cavities and SRC. OMC is at the interface between the MIF and the Output Optics group.

This working group's task is to set the optical parameters of the MIF (except for the ones set by the detector configuration group) and design the sensing and control scheme for the length and alignment. We are also responsible for maintaining the detailed optical layout.

Meetings

Hot Issues

Commissioning

ISC page

Optical Parameters

Instrument Control

Optical Layout

SVN

Lock Acquisition

RF PD

Task List

KAGRA/Subgroups/MIF (last edited 2022-10-26 08:40:33 by KeikoKokeyama)