Differences between revisions 33 and 34
Revision 33 as of 2016-06-10 15:24:52
Size: 1242
Comment:
Revision 34 as of 2016-06-13 16:57:47
Size: 1292
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Line 5: Line 4:
||[[LCGT/subgroup/ifo/ISC/Meetings|Meetings]] ||[[LCGT/subgroup/ifo/MIF/OptLayout|Optical Layout]] ||[[KAGRA/Subgroups/MIF/Commissioning|Commissioning]] ||[[LCGT/subgroup/ifo/MIF/HotIssues|Hot Issues]] ||
||[[Members|KAGRA/Subgroups/MIF/Members|Members]] ||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]] ||[[InstrumentControl|Instrument Control]] ||[[KAGRA/Subgroups/MIF/NoiseBudget|Noise Budget]] ||
||[[KAGRA/Subgroups/MIF/TaskList|Task List]] ||[[KAGRA/Subgroups/MIF/AEL|Analog Electronics]] ||[[LCGT/SVN|SVN]] ||[[LCGT/subgroup/ifo/ISC|ISC page]] ||
|| ||[[MIFInterfaces|Interfaces]] || ||[[KAGRA/Subgroups/MIF/GreenLock|Lock Acquisition]] ||
Line 6: Line 9:
||[[LCGT/subgroup/ifo/ISC/Meetings|Meetings]] ||[[LCGT/subgroup/ifo/MIF/HotIssues|Hot Issues]] ||[[KAGRA/Subgroups/MIF/Commissioning|Commissioning]] || [[KAGRA/Subgroups/MIF/NoiseBudget|Noise Budget]] ||
||[[LCGT/subgroup/ifo/ISC|ISC page]] ||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]] ||[[InstrumentControl|Instrument Control]] || ||
||[[LCGT/subgroup/ifo/MIF/OptLayout|Optical Layout]] ||[[LCGT/SVN|SVN]] ||[[KAGRA/Subgroups/MIF/GreenLock|Lock Acquisition]] ||||
||[[KAGRA/Subgroups/MIF/AEL|Analog Electronics]] ||[[KAGRA/Subgroups/MIF/TaskList|Task List]] ||[[MIFInterfaces|Interfaces]] ||||

Main Interferometer Subsystem

This is a Wiki page for Main Interferometer Subsystem (MIF).

Meetings

Optical Layout

Commissioning

Hot Issues

KAGRA/Subgroups/MIF/Members

Optical Parameters

Instrument Control

Noise Budget

Task List

Analog Electronics

SVN

ISC page

Interfaces

Lock Acquisition

Subsystem Definition

This subsystem is the main interferometer part of LCGT. The MIF consists of PRC, BS, Arm cavities and SRC. OMC is at the interface between the MIF and the Output Optics group.

This working group's task is to set the optical parameters of the MIF (except for the ones set by the detector configuration group) and design the sensing and control scheme for the length and alignment. We are also responsible for maintaining the detailed optical layout.