Differences between revisions 2 and 3
Revision 2 as of 2020-03-02 03:02:45
Size: 283
Comment:
Revision 3 as of 2020-03-02 03:07:10
Size: 1946
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * The complicate ground problem of the KAGRA may affect the sensitivity and it may be a critical issue for the O4 run.
 * There may be ground loop in the PSL table, there was strange coherence between ALS and CARM and so on.
 * We want to start the discussion how to clean the KAGRA ground.
Line 5: Line 8:
* Meeting information
  *
*Pick up the topics
 * Where/How/What ground should be prepared?
 * Requirement from AEL and DGS group
 * Requirement from Laser
 * Requirement from MIF (PDs, optical tables, …)
 * Requirement from Suspension and payload
 * Requirement from FCL, VAC and PEM
 * etc

* meeting style
 * 30min Japanese meeting for instrument
 * 30min English meeting for interferometer

If you have requirement, suggestion, comment, could you reply to this mail.

* 目的
 * KAGRAの複雑なグランドは、将来の観測に不安を残している
 * PSL光学定盤のグランドループやALSとCARMのおかしな相関などいろいろなことが発生している

* topics of discussion
 * どこに、どうやって、どのようなKAGRA グランドを用意するのか
 * 回路やデジタルグループからの要求や相談
 * レーザーグループからの要求や相談
 * 干渉計グループからの要求や相談(PDや光学定盤に関してなど)
 * サスペンション・ペイロードからの要求や相談
 * FCL, VAC, PEMなどのKAGRA装置維持グループからの相談や要求
 * その他

* Meeting style
 * 最初の30分を日本語で主に設置に関することを議論し
 * 後半の30分を英語で主に干渉計に関することを議論したいと思います。

* Meeting information
Line 10: Line 44:
||1||2020/3/05||[[KAGRA/Subgroups/PEM/GNDmeeting/200305/Agenda|Agenda]]|| [[KAGRA/Subgroups/PEM/GNDmeeting/200305/Minute|Minute]]|| || ||1||2020/03/05||[[KAGRA/Subgroups/PEM/GNDmeeting/200305/Agenda|Agenda]]|| [[KAGRA/Subgroups/PEM/GNDmeeting/200305/Minute|Minute]]|| kick-off meeting ||

GND meeting

* Purpose

  • The complicate ground problem of the KAGRA may affect the sensitivity and it may be a critical issue for the O4 run.
  • There may be ground loop in the PSL table, there was strange coherence between ALS and CARM and so on.
  • We want to start the discussion how to clean the KAGRA ground.

*Pick up the topics

  • Where/How/What ground should be prepared?
  • Requirement from AEL and DGS group
  • Requirement from Laser
  • Requirement from MIF (PDs, optical tables, …)
  • Requirement from Suspension and payload
  • Requirement from FCL, VAC and PEM
  • etc

* meeting style

  • 30min Japanese meeting for instrument
  • 30min English meeting for interferometer

If you have requirement, suggestion, comment, could you reply to this mail.

* 目的

  • KAGRAの複雑なグランドは、将来の観測に不安を残している
  • PSL光学定盤のグランドループやALSとCARMのおかしな相関などいろいろなことが発生している

* topics of discussion

  • どこに、どうやって、どのようなKAGRA グランドを用意するのか
  • 回路やデジタルグループからの要求や相談
  • レーザーグループからの要求や相談
  • 干渉計グループからの要求や相談(PDや光学定盤に関してなど)
  • サスペンション・ペイロードからの要求や相談
  • FCL, VAC, PEMなどのKAGRA装置維持グループからの相談や要求
  • その他

* Meeting style

  • 最初の30分を日本語で主に設置に関することを議論し
  • 後半の30分を英語で主に干渉計に関することを議論したいと思います。

* Meeting information

No.

Date

Agenda

Minute

Files

1

2020/03/05

Agenda

Minute

kick-off meeting

KAGRA/Subgroups/PEM/GNDmeeting (last edited 2020-04-05 23:59:43 by TakaakiYokozawa)