Differences between revisions 3 and 8 (spanning 5 versions)
Revision 3 as of 2020-03-02 03:07:10
Size: 1946
Comment:
Revision 8 as of 2020-04-05 23:59:43
Size: 2142
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
* Purpose
 * The complicate ground problem of the KAGRA may affect the sensitivity and it may be a critical issue for the O4 run.
 * There may be ground loop in the PSL table, there was strange coherence between ALS and CARM and so on.
 * We want to start the discussion how to clean the KAGRA ground.
 * Purpose
  * The complicate ground problem of the KAGRA may affect the sensitivity and it may be a critical issue for the O4 run.
  * There may be ground loop in the PSL table, there was strange coherence between ALS and CARM and so on.
  * We want to start the discussion how to clean the KAGRA ground.
Line 8: Line 8:
*Pick up the topics
 * Where/How/What ground should be prepared?
 * Requirement from AEL and DGS group
 * Requirement from Laser
 * Requirement from MIF (PDs, optical tables, …)
 * Requirement from Suspension and payload
 * Requirement from FCL, VAC and PEM
 * etc
 * Pick up the topics
  * Where/How/What ground should be prepared?
  * Requirement from AEL and DGS group
  * Requirement from Laser
  * Requirement from MIF (PDs, optical tables, …)
  * Requirement from Suspension and payload
  * Requirement from FCL, VAC and PEM
  * etc
Line 17: Line 17:
* meeting style
 * 30min Japanese meeting for instrument
 * 30min English meeting for interferometer
 * meeting style
  * 30min Japanese meeting for instrument
  * 30min English meeting for interferometer
Line 21: Line 21:
If you have requirement, suggestion, comment, could you reply to this mail.  * 目的
  * KAGRAの複雑なグランドは、将来の観測に不安を残している
  * PSL光学定盤のグランドループやALSとCARMのおかしな相関などいろいろなことが発生している
Line 23: Line 25:
* 目的
 * KAGRAの複雑なグランドは、将来の観測に不安を残している
 * PSL光学定盤のグランドループやALSとCARMのおかしな相関などいろいろなことが発生している
 * topics of discussion
  * どこに、どうやって、どのようなKAGRA グランドを用意するのか
  * 回路やデジタルグループからの要求や相談
  * レーザーグループからの要求や相談
  * 干渉計グループからの要求や相談(PDや光学定盤に関してなど)
  * サスペンション・ペイロードからの要求や相談
  * FCL, VAC, PEMなどのKAGRA装置維持グループからの相談や要求
  * その他
Line 27: Line 34:
* topics of discussion
 * どこに、どうやって、どのようなKAGRA グランドを用意するのか
 * 回路やデジタルグループからの要求や相談
 * レーザーグループからの要求や相談
 * 干渉計グループからの要求や相談(PDや光学定盤に関してなど)
 * サスペンション・ペイロードからの要求や相談
 * FCL, VAC, PEMなどのKAGRA装置維持グループからの相談や要求
 * その他
 * Meeting style
  * 最初の30分を日本語で主に設置に関することを議論し
  * 後半の30分を英語で主に干渉計に関することを議論したいと思います。
Line 36: Line 38:
* Meeting style
 * 最初の30分を日本語で主に設置に関することを議論し
 * 後半の30分を英語で主に干渉計に関することを議論したいと思います。

* Meeting information
 * Meeting information
Line 44: Line 42:
||1||2020/03/05||[[KAGRA/Subgroups/PEM/GNDmeeting/200305/Agenda|Agenda]]|| [[KAGRA/Subgroups/PEM/GNDmeeting/200305/Minute|Minute]]|| kick-off meeting || ||2||2020/04/08 10:00-11:00||[[KAGRA/Subgroups/PEM/GNDmeeting/200408/Agenda|Agenda]]|| [[KAGRA/Subgroups/PEM/GNDmeeting/200408/Minute|Minute]]|| Make todo list ||
||1||2020/03/05 13:00-14:00||[[KAGRA/Subgroups/PEM/GNDmeeting/200305/Agenda|Agenda]]|| [[KAGRA/Subgroups/PEM/GNDmeeting/200305/Minute|Minute]]|| kick-off meeting ([[KAGRA/Subgroups/PEM/GNDmeeting/200305/KIMURA|Kimura-san report]])||

GND meeting

  • Purpose
    • The complicate ground problem of the KAGRA may affect the sensitivity and it may be a critical issue for the O4 run.
    • There may be ground loop in the PSL table, there was strange coherence between ALS and CARM and so on.
    • We want to start the discussion how to clean the KAGRA ground.
  • Pick up the topics
    • Where/How/What ground should be prepared?
    • Requirement from AEL and DGS group
    • Requirement from Laser
    • Requirement from MIF (PDs, optical tables, …)
    • Requirement from Suspension and payload
    • Requirement from FCL, VAC and PEM
    • etc
  • meeting style
    • 30min Japanese meeting for instrument
    • 30min English meeting for interferometer
  • 目的
    • KAGRAの複雑なグランドは、将来の観測に不安を残している
    • PSL光学定盤のグランドループやALSとCARMのおかしな相関などいろいろなことが発生している
  • topics of discussion
    • どこに、どうやって、どのようなKAGRA グランドを用意するのか
    • 回路やデジタルグループからの要求や相談
    • レーザーグループからの要求や相談
    • 干渉計グループからの要求や相談(PDや光学定盤に関してなど)
    • サスペンション・ペイロードからの要求や相談
    • FCL, VAC, PEMなどのKAGRA装置維持グループからの相談や要求
    • その他
  • Meeting style
    • 最初の30分を日本語で主に設置に関することを議論し
    • 後半の30分を英語で主に干渉計に関することを議論したいと思います。
  • Meeting information

No.

Date

Agenda

Minute

Files

2

2020/04/08 10:00-11:00

Agenda

Minute

Make todo list

1

2020/03/05 13:00-14:00

Agenda

Minute

kick-off meeting (Kimura-san report)

KAGRA/Subgroups/PEM/GNDmeeting (last edited 2020-04-05 23:59:43 by TakaakiYokozawa)