== Memo for Commissioning break (Mar. 2020) == = Memo for Commissioning break (Mar. 2020) =

== '''Hammering test''' ==

=== Task list (Done) ===
 * Hammering test of the OMC chamber (Done 22nd Feb.)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13105|klog13105]]
  * There is excess in the sensitivity between 100 Hz to 400 Hz
  * Reported later, the main reason the vibration to the OMC legs for the optical table inside the vacuum
 * Hammering test AS table (Done 22nd Feb.)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13105|klog13105]]
  *
 * Reflection light check (Done 22nd Feb.)

=== Task list (Partially done) ===


=== Task list (todo ; must items) ===

=== Task list (todo ; if possible) ===

== ・PEM injection ==

Memo for Commissioning break (Mar. 2020)

'''Hammering test'''

Task list (Done)

  • Hammering test of the OMC chamber (Done 22nd Feb.)
    • klog13105

    • There is excess in the sensitivity between 100 Hz to 400 Hz
    • Reported later, the main reason the vibration to the OMC legs for the optical table inside the vacuum
  • Hammering test AS table (Done 22nd Feb.)
  • Reflection light check (Done 22nd Feb.)

Task list (Partially done)

Task list (todo ; must items)

Task list (todo ; if possible)

・PEM injection