Differences between revisions 9 and 10
Revision 9 as of 2020-03-09 04:21:14
Size: 700
Comment:
Revision 10 as of 2020-03-09 04:21:35
Size: 700
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
== Hammering test == == Hammering test ==

Memo for Commissioning break (Mar. 2020)

◯Hammering test

Task list (Done)

  • Hammering test of the OMC chamber (Done 22nd Feb.)
    • klog13105

    • There is excess in the sensitivity between 100 Hz to 400 Hz
    • Reported later, the main reason the vibration to the OMC legs for the optical table inside the vacuum
  • Hammering test AS table (Done 22nd Feb.)
  • Reflection light check (Done 22nd Feb.)

Task list (Partially done)

Task list (todo ; must items)

Task list (todo ; if possible)

・PEM injection

KAGRA/Subgroups/PEM/MAR2020 (last edited 2020-03-21 04:36:19 by TakaakiYokozawa)