Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2018-07-26 09:45:09
Size: 164
Comment:
Revision 4 as of 2018-08-01 17:53:11
Size: 561
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
== HOGE ==  * Kick off PEM projects
Line 11: Line 11:
 * Members, schedule
Line 12: Line 13:
== Others ==  * Yokozawa activities
  * rack check
  * TCam issue
  * Air monitors
  * BS re-cabling
  * PEM placement
  * Ondotori system
  * BS coil transfer function measurement
  * Microphone selection
  * Magnetometer circuits
  * Detector flags for future joint observation

 * Activity report
  * Seismometer
  * PSL PEM
  * Commissioning tools

 * Others

Minute of PEM meeting


  • Date: 2018/08/01 18:00-19:00
  • Attendance:
    • eZuce:


  • Kick off PEM projects
  • Members, schedule
  • Yokozawa activities
    • rack check
    • TCam issue
    • Air monitors
    • BS re-cabling
    • PEM placement
    • Ondotori system
    • BS coil transfer function measurement
    • Microphone selection
    • Magnetometer circuits
    • Detector flags for future joint observation
  • Activity report
    • Seismometer
    • PSL PEM
    • Commissioning tools
  • Others
  • Next meeting: ?/??.

KAGRA/Subgroups/PEM/Meeting/180801/Minute (last edited 2018-08-04 08:24:36 by TakaakiYokozawa)