Differences between revisions 18 and 19
Revision 18 as of 2019-06-25 12:02:31
Size: 2618
Comment:
Revision 19 as of 2019-06-25 12:02:52
Size: 2658
Comment:
Deletions are marked like this. Additions are marked like this.
Line 63: Line 63:
  * Yuzurihara
   * Yuzu summary page

Weekly PEM meeting

  • 2019/6/25(Tue) 17:00-(JST)
  • Regular meeting meeting
  • Web meeting with Zoom2 (Zoom2)

=== Agenda ===

  • General issue
    • Installation of the 1st PEM toward the O3 was (almost) completed!!
      • Center area, X end, Y end, weather station
      • Remaining : Magnetometer!!!
      • 2nd PEM installation will be started after the characterization of the chambers. (After O3??)
      • Washimi PEM webpage URL

      • PEM map provided by the medm was updated.
    • The power supply status measurements will be (re-)start soon
      • With the discussion with the Facility
    • Task list toward the O3
      • task sheet

      • Please send e-mail to me if you have comments.
    • Engineering run
      • 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity
      • What should we do toward the next engineering run
    • KIW6
      • Washimi-san and Kaihotsu-san presented
      • Currently, I heard that PEM activity is great! This is good news.
    • English meeting
      • We will have a monthly English meeting(Mainly share the information with Virgo people)
      • The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
      • 2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 URL

    • Seismon issue
      • We already installed to KAGRA system
      • Need the tuning for the KAGRA
      • Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???)
    • Yuzu summary page was upgraded!
      • There will be a report in the each member progress
    • One student (Yikang) will come to KAGRA and work with PEM group
      • Last his visiting was cryo issue
      • Magnetometer and shaker injection (?)
  • each member progress
    • Yokozawa
      • Coherent analysis during the engineering run
    • Washimi 
      • New accelerometer
      • plan for cryochamber characterization
      • other
    • Kozakai
      • Trigger rate analysis during engineering run
      • Collaboration with Yuzu summary page
    • Miyo
      • Effect the protect shied to the seismometer
      • Long term study of the KAGRA ground motion
    • Oshino
      • Weather station issue
    • TTanaka
      • Preparing for the PEM injection
      • Microphone calibration
    • Okutomi
      • Shaker injection
    • Kaihotsu, Mori
      • Report about the KIW6
    • Yuzurihara
      • Yuzu summary page
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/190625/Agenda (last edited 2019-06-29 15:55:02 by taiki.tanaka)