Line 63: Line 63:
    * We started the investigation around the EX0 rack today.
    * With Pcal noise investigation
Line 64: Line 66:
   * Plan for cryochamber characterization
   * Sound reverberation analysis
   * Kaminari monitoring
Line 68: Line 67:
    * Google chrome project
    * Accelerometer and microphone
    * They are very useful, especially potable feature is great.
    * Several spectral with short spectrogram was shown
Line 70: Line 73:
    * Debugging now
    * Current a few days failed?
Line 75: Line 80:
    * One year trend is now opened consistent with Sekiguchi-san. Time variance check.
    * 0.2Hz source dependence (0.15Hz??)
    * 1.2Hz came from the ikenoyama river, observed during bKAGRA phase1
    * Future issue is written in his github, welcome the comments
    * Future discussion towards the English meeting
Line 77: Line 87:
    * Web page ready, pick up information by the k1script ready, remaining issue is making the epics channel and caput
Line 79: Line 90:
    * Speaker will be arrived tomorrow
Line 80: Line 92:
    * Check with the coherent and non-coherent component
Line 81: Line 94:
    * JGW Doc
Line 85: Line 99:
    * Questions
    * They will join to KAGRA PEM once of the every week (Friday?)

Minute of PEM meeting


  • Date: 2019/7/2 17:00-18:00(JST)
  • Attendance: Yokozawa, Washimi, TTanaka, Okawa, Fujikawa, Mori, Kozakai, Kaihotsu, Miyo, Oshino, Yamat

=== Agenda ===

  • General issue
    • KAGRA interferometer status
      • PRC loss was large, birefringence effect?
      • FPMI or SRFPMI or DRFPMI
      • Open the CS area and remove the PRM and SRM?
      • Before that, we want to investigate the scattering effect at CS area
    • Chrome Book project
      • Portable PEM researcher
      • Spectral analyzer, sound recording, ...
      • USB accelerometer (Center area), microphone, ...

      • Data sharing GoogleDrive

    • Weekly PEM measurement
      • Friday is temporal weekly PEM measurement
      • Understanding the effect of the instruments and so on
      • Power supply
      • duct vibration
    • PEM DAQ sampling rate
      • Due to the limited DAQ power, almost all PEMs are taken at 2kHz sampling
      • Only PSL and CS microphone are taken with 16kHz sampling for the noise hunting
    • PEM injection
      • Shaker injection1 (Yikang, Yokozawa)
      • Shaker injection2 (Okutomi, Fabian)
      • acoustic injection (TTanaka)
      • magnetic field injection (Yikang, Yokozawa)
      • RF injection (TTanaka, Washimi)
    • 1st engineering run
      • 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity
    • Preparing toward the next engineering run
      • Next engineering run : 13th Jul.
      • Interferometer configuration ?
    • English meeting
      • We will have a monthly English meeting(Mainly share the information with Virgo people)
      • The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
      • 2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 URL

    • Seismon issue
      • We already installed to KAGRA system
      • Need the tuning for the KAGRA
      • Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???)
    • Task list toward the O3
      • task sheet

      • Please send e-mail to me if you have comments.
  • each member progress
    • Yokozawa
      • Power supply issue
        • We started the investigation around the EX0 rack today.
        • With Pcal noise investigation
    • Washimi 
      • Others and plan toward the JPS meeting
        • Google chrome project
        • Accelerometer and microphone
        • They are very useful, especially potable feature is great.
        • Several spectral with short spectrogram was shown
    • Kozakai
      • Trigger event identification
        • Debugging now
        • Current a few days failed?
      • Yuzu summary page comments
      • Others and plan toward the JPS meeting
    • Miyo
      • Effect the protect shied to the seismometer
      • Long term study of the KAGRA ground motion Link

        • One year trend is now opened consistent with Sekiguchi-san. Time variance check.
        • 0.2Hz source dependence (0.15Hz??)
        • 1.2Hz came from the ikenoyama river, observed during bKAGRA phase1
        • Future issue is written in his github, welcome the comments
        • Future discussion towards the English meeting
    • Oshino
      • Weather station issue
        • Web page ready, pick up information by the k1script ready, remaining issue is making the epics channel and caput
    • TTanaka
      • Preparing for the PEM injection
        • Speaker will be arrived tomorrow
      • Microphone calibration
        • Check with the coherent and non-coherent component
      • Thesis agenda and plan toward the JPS meeting
        • JGW Doc
    • Okutomi
      • Shaker injection
    • Kaihotsu
      • Report about the KIW6
        • Questions
        • They will join to KAGRA PEM once of the every week (Friday?)
    • Yuzurihara
      • Yuzu summary page comments
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/190702/Minute (last edited 2019-07-02 19:38:36 by TakaakiYokozawa)