= Minute of PEM meeting = * Date: 2019/7/24 17:00-18:00(JST) * Attend:Oshino, Yamat, TTanaka, Washimi, Kozakai, Fujikawa, Kaihotsu, Mori === Agenda ===   * General issue * KAGRA F2F meeting * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2019August|wiki]] * Yokozawa(Status), Washimi(Reports) * Welcome to have many posters * Chrome Book project (Portable PEM researcher) * http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable * We prepared two PEM Chromebook * Magnetometers * Two Bartington Mag-13MCL100 in the PEM rack * Three high sensitivity mini magnetometer (MI-CB-1DH-S-B, two for magnetic field gradient, one for Yikang study) * Task list toward the O3 * [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit#gid=1072504162|task sheet]] * Please send e-mail to me if you have comments. * Kamioka visitors * Yikang-san (8/5 - 8/17) * Yokoyama-san (8/6) * Fujikawa-san and Tanaka-san (8/18 - 8/31) * Ueshimi-san (??) * PEM injection * Shaker injection1 (TTanaka, Yokozawa) * Shaker injection2 (Okutomi, Fabian) * acoustic injection (TTanaka, Yokozawa) * magnetic field injection (Yikang, Yokozawa) * RF injection (TTanaka, Washimi) * Weekly PEM measurement * Friday is weekly PEM measurement * Understanding the effect of the instruments, search the origin of noise, and so on * Power supply, duct vibration, instruments * Cable noise study, Yend Magnetometer install, Clean up the IXC rack(7/26) * Cable noise study, IXC vibration study, Xend PCAL RxPD noise budget (8/2) * Virgo visiting * We will start the discussion to visit Virgo at October * Washimi(noise huntung with portable PEM), Miyo(ground motion) * [[KAGRA/Subgroups/PEM/EnMeeting|English meeting]] : The third Tuesday of every month 17:00-(JST) 10:00-(CEST) * 3rd meeting will be held at 20th Aug.(Tue) 17:00-18:00 URL * Weather alert * Alert to the IFO * Daily weather report * Each progress * Yokozawa * Coherent analysis with PEMs * Vacuum pump vibration and sound environment and its effect * 312.5Hz noise * Washimi  * Cryochamber characterization * After IXC vibration * Sound reverberation analysis * Large statistics * Kaminari monitoring * Seismometer vs accelerometer analysis : * EYC MAG * Finish the installation * PEM MAP update * with summary page * Kozakai * Trigger event identification * Yuzu summary page update (Figure image size) * update the 7/13 * K1:LSC-POP_PDA17... * reduced the image size * Yuzu CBC analysis * Consistency glitch search check * PSL noise hunting * Miyo * Effect the protect shied to the seismometer * Ground motion at 7/19 (ダム?) * Y > CS > X * トンネルのドームかも * Alert system by threshold analysis * Feedforward progress (This task is not PEM task, but I want to ask you to present a short status if there is) * TTanaka * Preparing for the PEM injection * Analysi of the PEM injection during 2nd engineering run * BNC noise evaluation * Okutomi * Shaker injection * Kaihotsu, Mori * Reports of the weekly PEM measurements * Yuzurihara * Yuzu summary page comments * etc * github progress