Differences between revisions 4 and 5
Revision 4 as of 2019-10-01 17:05:33
Size: 847
Comment:
Revision 5 as of 2019-10-01 17:22:56
Size: 857
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Attend:Ohkawa, Oshino, Kaihotsu, TTanaka, Kozakai, TNTanaka  * Attend:Ohkawa, Oshino, Kaihotsu, TTanaka, Kozakai, TNTanaka, Fujikawa
  • Minute of PEM meeting =
  • Date: 2019/10/01 17:00-18:00(JST)
  • Attend:Ohkawa, Oshino, Kaihotsu, TTanaka, Kozakai, TNTanaka, Fujikawa

Agenda

  • Each progress
    • Yokozawa
      • Coherent analysis for the FPMI, MICH and SRCL
      • Vacuum duct vibration analysis
      • SR3 oplev vibration
    • Washimi, Sugimoto 
      • Virgo visiting
    • Kozakai
      • Trigger analysis with silent run
    • TTanaka
      • Preparing for the PEM injection
    • Miyo
      • Seismic motion issue if there is topic
    • Okutomi
      • Shaker injection
    • Mori, Fujikawa
      • SR's vibration pdf

      • Fujimopy
      • Lockloss with earthquake
    • Yuzurihara
      • Yuzu summary page comments
    • Yamamoto
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/191001/Minute (last edited 2019-10-15 16:47:38 by TakaakiYokozawa)