Differences between revisions 6 and 8 (spanning 2 versions)
Revision 6 as of 2020-01-07 15:56:10
Size: 4065
Comment:
Revision 8 as of 2020-01-07 15:56:53
Size: 3921
Comment:
Deletions are marked like this. Additions are marked like this.
Line 37: Line 37:

---- /!\ '''Edit conflict - other version:''' ----
Line 42: Line 40:

---- /!\ '''Edit conflict - your version:''' ----

---- /!\ '''End of edit conflict''' ----
Line 57: Line 51:
  * [[https://sites.google.com/view/ugapw2020/home|地下宇宙若手研究会]] (2/22-24)   * [[https://sites.google.com/view/ugapw2020/home|地下宇宙若手研究会]]@茂住 (2/22-24)

Weekly PEM meeting

  • 2020/01/06(Tue) 16:00-(JST)
  • Regular meeting meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • December 17-24 24h engineering run
      • wiki

      • We also held the post ER. We turned off the FFUs and vacuum pumps
    • Lock acquisition to PRFPMI
    • There is still some peaks in the lower frequency
      • Type-A resonant frequency etc...
    • Peaks appeared at higher frequency
      • PEM injection to REFL table
    • Until Jan. 13th, ASC and lock trial of the PRFPMI will be higher priority
    • After that, we will move to noise hunting
    • ~100Hz noise and line noise of the higher frequency -> PEM

  • PEM plan January
    • Identification of the =100Hz noise source
      • (Maybe, ) the dominant noise for lower frequency may come from suspension
    • After the success of the PRFPMI (or chance to operate the FPMI), we would like to do following things
      • Jitter noise analysis
        • Camilla and Washimi-san evaluated the jitter noise at PSL room, but two order lower than current noise
        • But, we don't know the higher frequency
      • Understanding the coupling function detected at the refl table
        • At the some point, we detected the larger coupling function
        • Periscope or some optics?
      • We would like to inject sound or vibration to AS, POP and TMS table
      • Long term PEM evaluation
  • ICRR Kyodo-riyo
    • Yokozawa and Washimi-san prepared
  • PEM festival
    • This week(Friday?)
      • Evaluate the optical levers
        • Check OpLev cover is enough for O3 or not

        • Resonant frequency
    • 01/14(Tue) 9:00-15:00
    • 01/15(Wed) ??
      • Turned off almost all FFUs and vacuum pumps
  • Conference
  • PEM injection
    • Shaker injection1 (TTanaka, Yokozawa)
      • Where is the PZT shaker driver?
      • Acoustic injection -> Shaker injection

    • Shaker injection2 (Washimi, Camilla)
    • acoustic injection (TTanaka, Yokozawa)
      • PSL, REFL and AS table injection
      • Analysis is ongoing
    • magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
      • Effect of the air cooler magnetic field
      • AS, REFL table injection
  • Newtonian noise measurement
    • Thank you for Virgo PEM member!
    • Francesca mainly measured the newtonian noise
    • We will discuss in 21st. Jan.(Virgo KAGRA PEM meeting)
  • PEM measurement
    • Someday : Effect of the sound to DARM displacement
    • Someday : Environmental check around BS (including the POP)
    • Someday : Evaluation of the table cover
    • Someday : SR2 and SR3 optical lever (Reflection light from SRM?)

Each progress

  • Yokozawa
    • Suspension resonant frequency (with CRY and VIS team)
    • Post ER report1
    • Planning toward the O3 run
  • Washimi
    • post ER JGW-G2011165

    • Beam jitter study (Follow Camilla study, reported by Yokozawa?)
    • Sound reverberation study (KAGRA & Virgo)

  • Kozakai
    • Trigger analysis with ER run for the part of the PEM
    • Offline detchar report for the part of the PEM
  • TTanaka(ICRR)
    • shaker injection with FPMI
  • Fujikawa
    • Lock loss study2
    • fujimopy
  • TTanaka(Niigata)
    • Magnetic field from air cooler and compressor
    • Magnetic field injection to AS and REFL table
  • etc

KAGRA/Subgroups/PEM/Meeting/200107/Agenda (last edited 2020-01-07 17:12:37 by taiki.tanaka)