== Weekly PEM meeting == * 2020/01/08(Tue) 16:00-(JST) * Regular meeting meeting (Japanese) * Web meeting with Zoom2 ([[https://zoom.us/j/6676627462|Zoom2]]) * member : Ohkawa, Oshino, TT, Kozakai, Washimi, Tomaru, yamat ==== Each progress ==== * General issue * What is the material of the periscope at the REFL table? * How about LV meeting? * If we can get the result, it is better to join the GWADW at Hokkaido * It is better to join the young meeting at Kamioka * Yokozawa * Suspension resonant frequency (with CRY and VIS team) * Yamada-san proposed the resonant peaks for Type-A * 46Hz peak come from IM-PIT? * Protect the optical lever from the wind * Post ER report1 * Stopped the FFUs and vacuum pumps. * We couldn(t detect the difference in the floor, but we could identify the some peaks * Planning toward the O3 run * Discussed in the general issue * Washimi * post ER [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11165|JGW-G2011165]] * He investigated the noise between the FFU on and off more precisely * Line noises * Noise level was decreased at the 100Hz region * Disappear the 145Hz peak * He also tried to evaluate the coupling function by regarding the FFU as the injector * PEM injection for global area is not so significant, local injection is more significant * Beam jitter study (Follow Camilla study, reported by Yokozawa?) * Only 80Hz vibration injection * Table may vibrate at 60Hz * Sound reverberation study (KAGRA & Virgo) * Auto pulse finding program * Automate fitting with background tuning * Yend Aco has 1.5Hz resonant peak * Kozakai * Trigger analysis with ER run for the part of the PEM * Offline detchar report for the part of the PEM * TTanaka(ICRR) * shaker injection with FPMI[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11117|speaker@12/8]],[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11128|shaker@12/15]],[[attachment:mtg200107.pdf|meeting pdf]] * Master thesis[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10387|thesis]] * Fujikawa * Lock loss study2 * fujimopy * TTanaka(Niigata) * Magnetic field from air cooler and compressor * Magnetic field injection to AS and REFL table * etc * Pick up the items for the concern about the power supply and cabling * Check the cabling between rack and rack * Rack layout (for example, the Type-B use same circuit, rack design was different) * Use company for the cable re-connection * Reduce the plastic circuits