Differences between revisions 1 and 2
Revision 1 as of 2021-04-12 08:28:01
Size: 766
Comment:
Revision 2 as of 2021-04-23 07:59:04
Size: 4456
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== Virgo-KAGRA PEM meeting  ==
 * 2021-04-23(Fri) 17:00-18:00(JST) 9:00-10:00(CET)
== Weekly PEM meeting ==
 * 2021/04/16(Fri) 17:00-
* Regular meeting
Line 7: Line 8:
 * Journal paper
  * KAGRA Acoustic injection (Washimi et.al) [[https://arxiv.org/abs/2012.09294|arXiv:2012.09294]] : Accepted by CQG
  * KAGRA Lightening paper (Washimi et.al) : [[https://arxiv.org/abs/2103.06516|arXiv:2103.06516]] : Submitted to JINST
  * KAGRA NN evaluation paper (Fransisca et.al.) : To submit
  * KAGRA seismometer analysis paper (Alessandro et.al.) : submitted to Pure and Applied Geophysics
==== Conference issue ====
Line 13: Line 10:
 * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)  * GWADW (online), May 17-21, 2021
  * Registration deadline May 10
   * Rapid registration is recommended
 * 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university)
   * Washimi (& Yokoyama-san) have talk(s)
 
 * Future conferences
  * 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
  * GWPAW Hannover, Germany, Dec 14th-17th, 2021
Line 15: Line 20:
 * Schumann noise evaluation (Washimi) If you have some presentation about PEM related, please contact to me.
Line 17: Line 22:
 * Water fluid issue (Washimi) ==== General issue ====
Line 19: Line 24:
 * Infrasound measurement (Yokozawa)  * Interferometer schedule
  * VIS upgrade (ongoing)
   * EYC dirty check
   * IX LVDT ACC installation
   * Type-A height check
   * PR checks(Tighten the jigs)
  * IOO commissioning
   * IMC alignment(done)
   * Type-C suspension commissioning
    * Oplev recovery, characterization and calibration
    * Transfer function check
   * Noise budget
   * Trial of vibration transfer function
  * PMC calibration
   * Noise budget by PEMs

 * SEO budget
  * If you need material, please let me know

 * Schedule
  * Detail discussion in next Monday.
  * [[https://dac.icrr.u-tokyo.ac.jp/attachment/6069bec9f130890061c6136a|figure]]

 * PEM schedule
  * [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt|url]]
  * Magnetic field(Done)
  * Re-installation of PEMs toward O4


==== Jurnal paper issue ====
[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Reports/JurnalPaperIssue|Details are here!]]
  * PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) [[https://docs.google.com/spreadsheets/d/1Lz5RNxdjOhdZp6CBef-USUUPmyNTrhww9a7u39W7PSI/edit?usp=sharing|Check list]], [[https://gokagra.slack.com/archives/C015M111B5G|slack]] '''<<Writing>>'''
     * NB plot has been finalised
     * PWT is writing the draft for each part
  * Acoustic injection paper (Washimi) '''<<Published>>''' [[https://doi.org/10.1088/1361-6382/abf89a]]

  * Lightening paper (Washimi) '''<<Opened in arXiv>>''' [[https://arxiv.org/abs/2103.06516|arXiv:2103.06516 ]]
    * the English modification service has been finished.

  * Fractal paper (Alessandro) '''<<Submitted to Journal>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12438|JGW-P2112438]], [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/Seminar/210128|seminor slide]]

  * Newtonian noise paper (Francesca) '''<<Submit soon>>'''

  * Reverberation time paper (Washimi+) '''<<Start writing>>'''

  * ICA for E-run/O3GK (Kume, Yokoyama) '''<<Analysis ON GOING>>'''

  * Portable PEMs (Yokozawa+) '''<<Start writing>>'''

==== Preparation for O4 ====

  * Global Cabling issue
   * Cleaning the center area
   * Ask company (Candidate SK service)

  * PEM cabling plan
   * BS-IYC cable rack (After golden week)
   * New cable diagram
    * Discussed today
   * Cleaning around IY rack cables(Done)
   * MCF rack ready
   * Cabling schedule will be finalize next week

  * PEM sensors
   * Re-install the ACCs, MICs, MAGs before commissioning start
   * water fluid monitor
   * Magnetometers for Schumann resonance [[https://www.metronix.de/metronixweb/fileadmin/user_upload/Dokumente/Geophysiks/Induction%20Coil%20MFS-06e/FlyerMFS-06e_jap_v35.pdf|MFS-06e]]
    * Connector
    * Position
    * Measurement plan
    * Self noise evaluation

  * Vibration projection
   * Before closing the IMC chambers, IMC vacuum tables
   * Discussion with CAL team about A chamber

  * PEM injection
   * Acoustic injection at X/Y-end
   * Magnetic injection

 * After O4
   * RF monitor
   * Tiltmeter
   * RI detector
   * Newtonian noise

 * Discussion with DET members
  * Daily summary page PEM
  * Line identification
   * Yokozawa
   * VIS -> IOO -> MIF

==== Progress report ====
 
 * Investigation of ICA analysis
  * Task list and todo list
  * How to discuss?
 
 * Yokozawa
  * Cabling plan
  * Infrasound microphone
  * PSL, PMC issue(With Yamamoto-san)
  
 * Washimi
  * Magnetic field [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12777|JGW-G2112777]]
  * Water fluid monitor

 * Pil-Jong
  * Discussion of O3GK DET

 * Suzuki
  * Water simulation

 * Seismic motion analysis
  * O3GK
  * Microseismic
  * Long term

==== Place for memo ====

Weekly PEM meeting

Agenda

Conference issue

  • GWADW (online), May 17-21, 2021
    • Registration deadline May 10
      • Rapid registration is recommended
  • 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university)
    • Washimi (& Yokoyama-san) have talk(s)

  • Future conferences
    • 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
    • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

General issue

  • Interferometer schedule
    • VIS upgrade (ongoing)
      • EYC dirty check
      • IX LVDT ACC installation
      • Type-A height check
      • PR checks(Tighten the jigs)
    • IOO commissioning
      • IMC alignment(done)
      • Type-C suspension commissioning
        • Oplev recovery, characterization and calibration
        • Transfer function check
      • Noise budget
      • Trial of vibration transfer function
    • PMC calibration
      • Noise budget by PEMs
  • SEO budget
    • If you need material, please let me know
  • Schedule
    • Detail discussion in next Monday.
    • figure

  • PEM schedule
    • url

    • Magnetic field(Done)
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Acoustic injection paper (Washimi) <<Published>> https://doi.org/10.1088/1361-6382/abf89a

  • Lightening paper (Washimi) <<Opened in arXiv>> arXiv:2103.06516

    • the English modification service has been finished.
  • Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide

  • Newtonian noise paper (Francesca) <<Submit soon>>

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • Global Cabling issue
    • Cleaning the center area
    • Ask company (Candidate SK service)
  • PEM cabling plan
    • BS-IYC cable rack (After golden week)
    • New cable diagram
      • Discussed today
    • Cleaning around IY rack cables(Done)
    • MCF rack ready
    • Cabling schedule will be finalize next week
  • PEM sensors
    • Re-install the ACCs, MICs, MAGs before commissioning start
    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Connector
      • Position
      • Measurement plan
      • Self noise evaluation
  • Vibration projection
    • Before closing the IMC chambers, IMC vacuum tables
    • Discussion with CAL team about A chamber
  • PEM injection
    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM
    • Line identification
      • Yokozawa
      • VIS -> IOO -> MIF

Progress report

  • Investigation of ICA analysis
    • Task list and todo list
    • How to discuss?
  • Yokozawa
    • Cabling plan
    • Infrasound microphone
    • PSL, PMC issue(With Yamamoto-san)
  • Washimi
  • Pil-Jong
    • Discussion of O3GK DET
  • Suzuki
    • Water simulation
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo

KAGRA/Subgroups/PEM/Meeting/210423/Agenda (last edited 2021-04-23 17:01:03 by HirotakaYuzurihara)