Line 2: Line 2:
 * 2021/04/16(Fri) 17:00-  * 2021/04/23(Fri) 17:00-
Line 29: Line 29:
   * PR checks(Tighten the jigs)
  * IOO commissioning
   * IMC alignment(done)
   * Type-A oplev characterization
* PRs checks(Tighten the jigs)
  * IO commissioning
   * Optics characterization
    * A
lignment done
    * Acceptance check yesterday
Line 35: Line 38:
   * Noise budget
   * Trial of vibration
transfer function
  * PMC calibration
   * Noise budget by PEMs

* SEO budget
  * If y
ou need material, please let me know
  * MCo transfer function anomaly
  * PMC calibration
  * Noise budget by PEMs
    * Sound check
Line 44: Line 44:
  * Detail discussion in next Monday.
Line 58: Line 57:
  * Acoustic injection paper (Washimi) '''<<Published>>''' [[https://doi.org/10.1088/1361-6382/abf89a]]
Line 65: Line 63:
  * Newtonian noise paper (Francesca) '''<<Submit soon>>'''   * Newtonian noise paper (Francesca) '''<<Submitted>>'''
Line 75: Line 73:
  * Global Cabling issue
   * Cleaning the center area
   * Ask company (Candidate SK service)
Line 80: Line 74:
   * Electric box position
Line 85: Line 80:
   * Cabling schedule will be finalize next week    * Cabling schedule       * Discussed today
Line 91: Line 87:
    * Connector
    * Position
    * Measurement plan
    * Self noise evaluation
    * Develop the satellite box
Line 119: Line 112:
  * Task list and todo list
  * How to discuss?
  * Progress
Line 125: Line 117:
  * PSL, PMC issue(With Yamamoto-san)
Line 137: Line 128:
 * Yuzurihara
  * Instrumental noise of sensor measure

Weekly PEM meeting

Agenda

Conference issue

  • GWADW (online), May 17-21, 2021
    • Registration deadline May 10
      • Rapid registration is recommended
  • 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university)
    • Washimi (& Yokoyama-san) have talk(s)

  • Future conferences
    • 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
    • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

General issue

  • Interferometer schedule
    • VIS upgrade (ongoing)
      • EYC dirty check
      • IX LVDT ACC installation
      • Type-A height check
      • Type-A oplev characterization
      • PRs checks(Tighten the jigs)
    • IO commissioning
      • Optics characterization
        • Alignment done
        • Acceptance check yesterday
      • Type-C suspension commissioning
        • Oplev recovery, characterization and calibration
        • Transfer function check
        • MCo transfer function anomaly
      • PMC calibration
        • Noise budget by PEMs
        • Sound check
  • Schedule
  • PEM schedule
    • url

    • Magnetic field(Done)
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Lightening paper (Washimi) <<Opened in arXiv>> arXiv:2103.06516

    • the English modification service has been finished.
  • Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide

  • Newtonian noise paper (Francesca) <<Submitted>>

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling plan
    • Electric box position
    • BS-IYC cable rack (After golden week)
    • New cable diagram
      • Discussed today
    • Cleaning around IY rack cables(Done)
    • MCF rack ready
    • Cabling schedule
      • Discussed today
  • PEM sensors
    • Re-install the ACCs, MICs, MAGs before commissioning start
    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Develop the satellite box
  • Vibration projection
    • Before closing the IMC chambers, IMC vacuum tables
    • Discussion with CAL team about A chamber
  • PEM injection
    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM
    • Line identification
      • Yokozawa
      • VIS -> IOO -> MIF

Progress report

  • Investigation of ICA analysis
    • Progress
  • Yokozawa
    • Cabling plan
    • Infrasound microphone
  • Washimi
  • Pil-Jong
    • Discussion of O3GK DET
  • Suzuki
    • Water simulation
  • Yuzurihara
    • Instrumental noise of sensor measure
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo