== Weekly PEM meeting == * 2021/09/24(Fri) 17:00- * Regular meeting * Zoom2 : https://zoom.us/j/6676627462 ==== Conference issue ==== * 宇宙素粒子若手の会 秋の研究会 [[http://www.icrr.u-tokyo.ac.jp/YMAP/event/conf2021/index.html|URL]] * 11/5-7 @ Kashiwa * Registration Deadline : 10/2 * Other meetings [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/DAWG/conferences|url]] * GWPAW Hannover, Germany, Dec 14th-17th, 2021 If you have some presentation about PEM related, please contact to me. ==== Business travel ==== * Depending on the situation of COVID-19 * Yokoyama-san 9/28 - 10/01 ==== General issue ==== * Interferometer schedule * Procedure toward X arm commissioning * Pcal finalize->Suspension health check->Acceptance check * Commissioning of tower part suspension * IO commissioning * IMC ASC * IR alignment * * Mid size baffle installation * * Y arm commissioning * SR3 suspension commissioning * Green Y alignment * Oplev preparation * Schedule * [[https://dac.icrr.u-tokyo.ac.jp/attachment/6069bec9f130890061c6136a|figure]] * PEM schedule * Re-installation of PEMs toward O4 ==== Jurnal paper issue ==== [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Reports/JurnalPaperIssue|Details are here!]] * PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) [[https://docs.google.com/spreadsheets/d/1Lz5RNxdjOhdZp6CBef-USUUPmyNTrhww9a7u39W7PSI/edit?usp=sharing|Check list]], [[https://gokagra.slack.com/archives/C015M111B5G|slack]] '''<>''' * NB plot has been finalised * PWT is checking the draft v0 * Reverberation time paper (Washimi+) '''<>''' * ICA for E-run/O3GK (Kume, Yokoyama) '''<>''' * Portable PEMs (Yokozawa+) '''<>''' ==== Preparation for O4 ==== * PEM cabling * XY-end channel assignment [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13125|JGWDco13125]] and cabling * Preparation of both XY end PEM channel was done * MAG+MIC+ACC, portable around A and C chamber * Box install for XY front/end * Cabling to Xfront * Start project * MIC install soon * Seis for BS/OMC * We will perform the vibration test around OMC chamber. * We will install seismometer at the week of 27th Sep. * Voltage monitor * Booth MIC setting * BS, SR done * Table PEM setting (After IMC ASC commissioning) * Set calibration factor * New PEM * Ondotori * Pt 100 by ondotori * TEAC710 * 電界計 (EFM; electric field mill) * ACO power supply with low frequency * Vibration projection * Discussion with CAL team about A chamber * 9/21(Tue) * Vibration test of OMC chamber * Middle of October * After arriving the geophone for Yend * Chamber closing plan * PEM injection * Low-frequency sound injector[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16829|klog16829]] * Acoustic injection at X/Y-end * Magnetic injection * After O4 * RF monitor * Tiltmeter * RI detector * Newtonian noise * Discussion with DET members * Daily summary page PEM ==== Progress report ==== * Yuzurihara * Interferometer commissioning * Pastavi * Nishizawa * Magnetic field analysis * Hoshino * Seismic motion analysis * Investigation of ICA analysis * Progress * Suzuki * Water simulation * Washimi * JPS report [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13120|JGW-G2113120]] * Analysis and simulation for the Schumann resonance * Yokozawa * Temperature at PSL room * Seismic motion analysis * O3GK * Microseismic * Long term ==== Place for memo ====