⇤ ← Revision 1 as of 2022-01-21 07:11:45
4146
Comment:
|
← Revision 2 as of 2022-01-21 07:18:00 ⇥
3690
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2022/01/14(Fri) 17:00- | * 2022/01/21(Fri) 17:00- |
Line 7: | Line 7: |
* 新学術領域「地下宇宙」第8回超新星ニュートリノ研究会 [[http://www.lowbg.org/ugap/ws/sn2022/index.html]] * 2022年1月6日(木)、7日(金) @ 早稲田+オンライン * 鷲見(Noise budget, [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13555|JGW-G2213555]]) |
|
Line 26: | Line 22: |
* 共同利用の予算がまだありますのでご相談ください。 | |
Line 30: | Line 25: |
* Washimi (Tokyo, New year) | * No plan |
Line 34: | Line 29: |
* Tonga volcano * If you have some idea of science, please let me know |
|
Line 35: | Line 33: |
* Both IX and EX started pumping down * Both ~10^-4 Pa * Leak test done * IR flash detected |
* IR cavity lock succeeded |
Line 40: | Line 35: |
* IO commissioning * IMC ASC |
* IO commissioning * IMC ASC * New QPD monitor |
Line 43: | Line 39: |
* Mid size baffle installation * After IR alignment |
* Mid size baffle installation * After IR alignment |
Line 46: | Line 42: |
* Y arm commissioning * Green Y alignment SR3->ETMY->POS table * ETMY alignment done * Oplev preparation->Next week |
* Y arm commissioning * Green Y alignment SR3->ETMY->POS table * ETMY alignment done * PCal finalize * Oplev preparation : ongoing |
Line 110: | Line 107: |
* Pastavi [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19418|k-log 19418]] | * Pastavi |
Line 126: | Line 123: |
* something | * Tonga |
Weekly PEM meeting
- 2022/01/21(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Meeting and Conference issue
JPS meeting URL
- 2022年3月15日(火)~3月19日(土)@ 岡山大学
- 登壇登録 : 11月16日 ~ 12月2日
- 横澤(Overview)、鈴木(NN)、粂(non-linear ICA)、小林(O3GK ICA)
鷲見(Noise budget, JGW-G2213473)
- 2022年3月15日(火)~3月19日(土)@ 岡山大学
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- KAGRA site is heavy snow now
- Depending on the situation of COVID-19
- To Kamioka
- No plan
- From Kamioka
- No plan
- To Kamioka
General issue
- Tonga volcano
- If you have some idea of science, please let me know
- Procedure toward X arm commissioning
- IR cavity lock succeeded
- IO commissioning
- IMC ASC
- New QPD monitor
- Mid size baffle installation
- After IR alignment
- Y arm commissioning
Green Y alignment SR3->ETMY->POS table
- ETMY alignment done
- PCal finalize
- Oplev preparation : ongoing
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
- Collaborator circulation (~1/7)
Invited review paper (Washimi+) JGW-P2113549
- Acoustic reverberation time paper (Washimi+)
- Washimi will write in the New Year holidays
- ICA for E-run/O3GK (Kume, Yokoyama)
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- New oplev noise budget
- EX
- Main work : Wind, vibration and sound injection FFU on/off
- Prepare to set the PEMs
- Electrical box
- Accelerometers
- Seismometer (Move from BS)
- Magnetometer
- Microphone
- PEM injection
- New PEM
- PSL room with Cryocon
- TEAC710
- 電界計 (EFM; electric field mill)
- ACO power supply with low frequency
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Investigation of ICA analysis
- Progress
- Nishizawa
- Magnetic field analysis
- Washimi
- Tonga
- Yokozawa
- EX oplev noise budget
- Seismic motion analysis
- O3GK
- Microseismic
- Long term