Differences between revisions 2 and 3
Revision 2 as of 2022-03-18 07:18:25
Size: 5383
Comment:
Revision 3 as of 2022-03-18 16:47:15
Size: 5320
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
   * Registration [[https://forms.gle/eGqk6F2teQYfszXy5|URL]]

Weekly PEM meeting

Report

  • C2C program request
    • 1) participate in the international conferences related GW researches (in Japan and abroad),
    • 2) stay for the collaboration work in the counter part countries (UK, USA, Australia, Italy, Gernamy, France, China, Korea, Taiwan, India, VIetnam) .
    • 3) participate KAGRA F2F if it will be held onsite.

Meeting and Conference issue

  • JPS meeting URL

    • 2022年3月15日(火)~3月19日(土) program

      • オンライン開催(2/19情報url)

      • 横澤(Overview)、鈴木(NN)、粂(non-linear ICA)、小林(O3GK ICA)
      • 鷲見(Noise budget, JGW-G2213473)

  • LVK meeting URL

    • Online
    • Mar 14-17
  • JpGU 2022 (日本地球惑星科学連合2022年大会)
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
    • To Kamioka
      • Aoyama gakuin member
    • From Kamioka
      • No

General issue

  • Procedure toward X arm commissioning
    • IR cavity lock succeeded
      • Recovery of alignment after Fukushima earthquake
    • TMSX commissioning
      • Trial of the pumping down
    • Lock loss study
      • PLL, signal mis-connection, control linear range
    • Time series check
    • TCam check
      • Script to find the edge of the sapphire mirror
  • IO commissioning
    • IMC ASC
  • Y arm commissioning
    • ITMY alignment : Done
    • Yarm commissioning
      • Green lock succeeded(~1s), need the suspension commissioning
    • ITMY suspension : ongoing
    • PCal finalize : ongoing
    • Oplev preparation : EY done, IY will start
    • BS alignment
    • Green laser performance
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405

    • Collaborator circulation (~1/7)
  • Invited review paper (Washimi+) JGW-P2113549

  • Tonga signal paper (Washimi+)
    • Writing
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
  • ICA for E-run/O3GK (Kume, Kobayashi)
    • Start writing
  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • New seismometer arrived
  • PEM installation check
    • Electrical box
      • Installed to XY end
      • Cabling
      • ACO power supply
  • MN oplev noise investigation
    • Light source
  • New oplev noise budget
    • EX
    • Main work : Wind, vibration and sound injection FFU on/off
    • Prepare to set the PEMs
      • Accelerometers
      • Seismometer (Move from BS)
      • Magnetometer
      • Microphone
      • PEM injection
  • New PEM
    • PSL room with Cryocon
    • TEAC710
    • 電界計 (EFM; electric field mill)
    • ACO power supply with low frequency
  • Magnetmeters for the Schumann resonance
    • Discussing with technicians (AEL, FCL)
  • PEM injection
    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Practice for JPS meeting

  • Yokozawa (Just showed the slide)
  • Suzuki
  • Kobayashi
  • Kume (Just showed the slide)

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report
    • Data quality evaluation
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Investigation of ICA analysis
    • Progress
  • Nishizawa
    • Magnetic field analysis
  • Washimi
    • Tonga analysis
  • Yokozawa
    • Report of Aoyama gakuin group
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo

KAGRA/Subgroups/PEM/Meeting/220318/Agenda (last edited 2022-03-18 16:49:12 by tatsuki.washimi)