Differences between revisions 3 and 4
Revision 3 as of 2022-09-02 09:11:21
Size: 4730
Comment:
Revision 4 as of 2022-09-02 09:12:41
Size: 4776
Comment:
Deletions are marked like this. Additions are marked like this.
Line 51: Line 51:
  * 8/29-9/3 Miyamoto from ICRR    * 8/29-9/3 Miyamoto from ICRR
Line 53: Line 53:
    * JPS meeting (9/4-9/8)     * Kochi University of Technology (9/5)
* JPS meeting (9/6-9/8)

Weekly PEM meeting

General announcement

  • KAGRA visiting plan
    • Welcome to visit KAGRA site
    • Please contact to Ohashi-san
  • Important discussion with ET people
    • Magnetic field from infrastructure
    • If you want to join the discussion, please let Yokozawa know.
  • Visiting to Virgo site
    • By C2C budget
    • Contact to Virgo people
    • Next year?

Meeting and Conference issue

  • LVK meeting
    • 12-15 September
    • Cardiff Unviersity, UK
  • JPS meeting
    • url

    • 2022/9/6-8 Okayama
      • Washimi : Infrasound JGW-G2214185

      • Hoshino : Seismic and ocean
    • Onsite
  • 日本天文学会
    • 9/13-15
    • 新潟大学
  • ET symposium in Budapest, Hungary
  • GR23 in Beijin, China
  • GWPAW2022 in Melbourne Australia
  • GRASS 2022 in Padova, Italy
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • 8/29-9/3 Miyamoto from ICRR
  • From Kamioka
    • Kochi University of Technology (9/5)
    • JPS meeting (9/6-9/8)

General issue

  • Overall schedule
    • 8/22 - 8/26 Closing the center area PRM~PR2
    • 8/29 - 9/2 Closing the center area ~SRM
    • 9/5 - 9/6 Alignment check mirror surface, closing the chamber side
    • 9/7 Start pumping down if all works well
  • X arm commissioning
    • End X IM 81K
    • We will start the noise budget of the new oplev again
  • Y arm commissioning
    • IY duct shield cooling
    • TMSY vacuum preparation
  • Beam dump around IFI
    • Treatment of ghost beam dumping
  • TCam analysis
    • Find the beam position
  • New high power laser
    • Chiller preparation
    • Turned on
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4
  • 出張PEM injection (planning form)

Jurnal paper issue

Details are here!

Preparation for O4

  • Barometers and infrasound placement underground
    • Set the temperature, humidity and barometer to each station
    • Check the cabling at Yarm
    • Search the PEMs for air monitor
  • Seismic and infrastructure noise
    • Call for analysis person
    • After infrasound microphone installation
  • Magnetmeters for the Schumann resonance
    • Fukunaga-san's report
    • ADU (Washimi)
    • Discussing with technicians (AEL, FCL)
  • Weather station
    • Weather in KAGRA entrance
    • New weather station
    • Calibration
  • PEM injection (planning form)

    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection (I want to start the preparation soon)
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Miyamoto
    • Weather analysis
  • Kume
    • Report of paper progress
  • Fukunaga
    • Schumann resonance
  • Kiyota
    • Take over Kobayashi-san's work
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • New pictures about infrasound
  • Yokozawa
    • Investigating the MN oplev glitch

Place for memo

KAGRA/Subgroups/PEM/Meeting/220902/Agenda (last edited 2022-09-02 09:12:41 by tatsuki.washimi)