Differences between revisions 1 and 2
Revision 1 as of 2022-12-01 14:22:09
Size: 5828
Comment:
Revision 2 as of 2022-12-01 14:27:28
Size: 5614
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2022/11/25(Fri) 17:00-  * 2022/12/02(Fri) 17:00-
Line 44: Line 44:
   * Registration : 11/15〜12/1    * Registration : Finished
    * Washimi(Schumann resonance)
    * Fulunaga(Schumann resonance)
    * Miyamoto(Weather)
Line 58: Line 61:
  * 11/13-11/23 Kiyota   *
Line 60: Line 63:
  *
Line 64: Line 68:
  * OMC : Started the pumping down
   * Review for beacom and pumping down
  * TMSY : In vac, leak test done, opened the gate valve after 22nd Nov.

 * IMC trouble
  * Function generator broken
   * Repaired
  * OMC : Continuously pumped down
   * OMC LSC and ASC worked
   * OMC locked
   * Beacon study ongoing
  * TMSY : In vac, opened gate valve between EYC and TMSY
   * Started the duct shield cooling down
Line 76: Line 79:
 * Suspension
  * I
mplemented the IP filter

  * PRMI lock trial
   * Search the good alignment
    * ADS engaged and alignment of the IMMT1,2 and PRM

 
* FPMI lock succeeded
  * DARM(AS17), CARM(REFL45), MICH(REFL51->POP17)
   * Latest sensitivity [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22097|klog22097]]
   * Calibration evaluation
   * Control filter optimization
   * Interferometer characterization
 * PRMI lock trial
 
* Search the good alignment

* FPMI lock succeeded
  * DARM(AS17), CARM(REFL45), MICH(REFL51->POP17)
  * Latest sensitivity [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22097|klog22097]]
  * Calibration evaluation
  * Control filter optimization
  * Interferometer characterization
Line 92: Line 91:
   * We will start the noise budget of the new oplev again
   * OMC ASC using the Xend test mass
    * Signal was detected in OMC PD
Line 97: Line 93:
   * IY duct shield cooling    * IY, EY duct shield cooling
Line 109: Line 105:

  * OMC
   * First contact applied
   * Magnet recovery
   * Alignment
   * OMC locked
Line 207: Line 196:
  *   * Discussion in F2F meeting
Line 210: Line 199:
  *   * Discussion in F2F meeting

Weekly PEM meeting

General announcement

  • KAGRA visiting plan
    • Welcome to visit KAGRA site
    • Please contact to Ohashi-san
  • Important discussion with ET people
    • Magnetic field from infrastructure
    • If you want to join the discussion, please let Yokozawa know.
  • Visiting to Virgo site
    • By C2C budget
    • Contact to Virgo people
      • Next year?

Meeting and Conference issue

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
  • From Kamioka

General issue

  • Overall schedule
    • OMC : Continuously pumped down
      • OMC LSC and ASC worked
      • OMC locked
      • Beacon study ongoing
    • TMSY : In vac, opened gate valve between EYC and TMSY
      • Started the duct shield cooling down
  • Interferometer overall
    • Initial alignment experiment
      • 16:00- everyday
  • PRMI lock trial
    • Search the good alignment
  • FPMI lock succeeded
    • DARM(AS17), CARM(REFL45), MICH(REFL51->POP17)

    • Latest sensitivity klog22097

    • Calibration evaluation
    • Control filter optimization
    • Interferometer characterization
    • X arm commissioning
      • End X IM 85K
    • Y arm commissioning
      • IY, EY duct shield cooling
    • New high power laser
      • PMC locked
    • ISS
      • Control loop done
      • Characterization is ongoing
    • ASC preparation
      • Sensing matrix measurements
      • Offset evaluation
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4
  • 出張PEM injection (planning form)

Jurnal paper issue

Details are here!

Preparation for O4

  • Weather station
    • Weather in KAGRA entrance
    • New weather station
    • Calibration
  • Investigation of the PEM injection is just started
    • New DAC preparation
    • Acoustic injection at PSL/IMMCS/X/Y-end
    • Magnetic injection (After Washimi-san visiting to Virgo)
    • Portable PEM injectors
  • Voltmeter preparation
    • We made the PEM channel
      • K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
      • K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
    • Need the AC power monitor?
  • Schumann resonance outside
    • Measured from end of Aug.
    • Position slightly changed
      • X(to be the angle between X and Y to 90 deg)
      • Z(-10 cm)
    • Prepared the AC power supply and LAN cable
    • Start the measurement of the electric field
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Miyamoto
    • Weather analysis
  • Kume
    • Report of paper progress
  • Fukunaga
    • Schumann resonance
  • Kiyota
    • Power line noise investigation
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • Discussion in F2F meeting
  • Yokozawa
    • Discussion in F2F meeting

Place for memo

KAGRA/Subgroups/PEM/Meeting/221202/Agenda (last edited 2022-12-01 14:27:28 by TakaakiYokozawa)