== Weekly PEM meeting == * 2022/12/09(Fri) 17:00- * Regular meeting * Zoom2 : https://zoom.us/j/6676627462 ==== General announcement ==== * KAGRA visiting plan * Welcome to visit KAGRA site * Please contact to Ohashi-san * Important discussion with ET people * Magnetic field from infrastructure * If you want to join the discussion, please let Yokozawa know. * Visiting to Virgo site * By C2C budget * Contact to Virgo people * Next year? ==== Meeting and Conference issue ==== * 第7回 宇宙素粒子若手の会 秋の研究会 [[https://www.icrr.u-tokyo.ac.jp/YMAP/event/conf2022/index.html]] * 12/9, 10 @ 神岡 * Registration : 〜11/20 * JPS meeting (Online) * Registration : Finished * Washimi(Schumann resonance) * Fulunaga(Schumann resonance) * Miyamoto(Weather) * GR23 in Beijin, China * GWPAW2022 in Melbourne Australia (5-9 December) * Other meetings [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/DAWG/conferences|url]] If you have some presentation about PEM related, please contact to me. ==== Business travel ==== * Depending on the situation of COVID-19 * To Kamioka * Miyamoto(12/12-24) * From Kamioka * ==== General issue ==== * Overall schedule * OMC : LSC and ASL locked * DC readout done * EYC cooling down * Opened the gate valve between EYC and TMSY * Started the duct shield cooling down * Interferometer overall * PRMI lock succeeded * PRFPMI Lock trial * FPMI lock succeeded * DARM(AS17), CARM(REFL45), MICH(REFL51->POP17) * Latest sensitivity [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22097|klog22097]] * Calibration evaluation * Control filter optimization * Interferometer characterization * X arm commissioning * End X IM 86K * Y arm commissioning * IY, EY duct shield cooling * New high power laser * PMC locked * IMC locked * ISS * Control loop done * Characterization is ongoing * ASC preparation * Sensing matrix measurements * Offset evaluation * Schedule * [[attachment:Schedule_220325.pdf|attachment]] * PEM schedule * Re-installation of PEMs toward O4 * 出張PEM injection ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14016|planning form]]) * ==== Jurnal paper issue ==== [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Reports/JurnalPaperIssue|Details are here!]] * ICA for E-run/O3GK (Kume, Kobayashi) * [[https://arxiv.org/abs/2206.05785]] * Micro seismic analysis (Hoshino) * writing * [[https://ja.overleaf.com/project/627270d6b67cab411d1c7d32|Overleaf]] * Acoustic reverberation time paper (Washimi+) * Suspend * Re-measurement before O4? ==== Preparation for O4 ==== * Weather station * Weather in KAGRA entrance * New weather station * Calibration * Investigation of the PEM injection is just started * New DAC preparation * Acoustic injection at PSL/IMMCS/X/Y-end * Magnetic injection (After Washimi-san visiting to Virgo) * Portable PEM injectors * Voltmeter preparation * We made the PEM channel * K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF} * K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF} * Need the AC power monitor? * Schumann resonance outside * Measured from end of Aug. * Position slightly changed * X(to be the angle between X and Y to 90 deg) * Z(-10 cm) * Prepared the AC power supply and LAN cable * Start the measurement of the electric field * After O4 * RF monitor with mokugo * Tiltmeter * RI detector * Newtonian noise * Discussion with DET members * Daily summary page PEM ==== Progress report ==== * Yuzurihara * Pastavi * Data Quality Report [[https://dcc.ligo.org/G2201168|slide]] * Data quality evaluation * Suzuki * Water simulation * Hoshino * Seismic motion analysis * Miyamoto * Weather analysis * Kume * Report of paper progress * Fukunaga * Schumann resonance * Kiyota * Power line noise investigation * Nishizawa * Water newtonian noise * Magnetic field analysis * Washimi * Report the Virgo/ET visiting * Yokozawa * Discussion in F2F meeting ==== Place for memo ==== * [[https://www.gw-openscience.org/O3/o3aspeclines/|Line noise list in O3a public data]] * [[https://pubplan.ligo.org/CW/KAGRA_VectorDM.html|Summary page for KAGRA O3 vector dark matter]]