Differences between revisions 2 and 3
Revision 2 as of 2022-12-16 05:52:43
Size: 4769
Comment:
Revision 3 as of 2022-12-16 05:53:29
Size: 4900
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
  *   * [[attachment:authorlisttasklist_PEM_2023.pdf|task list 2023]]
  * Also, please contact to me if there are question or consultation

Weekly PEM meeting

General announcement

  • Author list application 2022
    • [kagra 05488]
    • If you have question or consultation, please contact to Yokozawa and Washimi-san
  • Task list generation 2023
    • task list 2023

    • Also, please contact to me if there are question or consultation
  • KAGRA visiting plan
    • Welcome to visit KAGRA site
    • Please contact to Ohashi-san
  • Important discussion with ET people
    • Magnetic field from infrastructure
    • If you want to join the discussion, please let Yokozawa know.
  • Visiting to Virgo site
    • By C2C budget
    • Contact to Virgo people
      • Next year?

Meeting and Conference issue

  • 第7回 宇宙素粒子若手の会 秋の研究会 https://www.icrr.u-tokyo.ac.jp/YMAP/event/conf2022/index.html

    • 12/9, 10 @ 神岡
    • Registration : 〜11/20
  • JPS meeting (Online)
    • Registration : Finished
      • Washimi(Schumann resonance)
      • Fulunaga(Schumann resonance)
      • Miyamoto(Weather)
  • GR23 in Beijin, China
  • GWPAW2022 in Melbourne Australia (5-9 December)
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • Miyamoto(12/12-24)
  • From Kamioka

General issue

  • Overall schedule
    • OMC : LSC and ASL locked
      • DC readout done
  • EYC cooling down
    • Opened the gate valve between EYC and TMSY
    • Started the duct shield cooling down
  • Interferometer overall
    • PRMI lock succeeded
    • PRFPMI Lock trial
  • FPMI lock succeeded
    • DARM(AS17), CARM(REFL45), MICH(REFL51->POP17)

    • Latest sensitivity klog22097

    • Calibration evaluation
    • Control filter optimization
    • Interferometer characterization
    • X arm commissioning
      • End X IM 86K
    • Y arm commissioning
      • IY, EY duct shield cooling
    • New high power laser
      • PMC locked
      • IMC locked
    • ISS
      • Control loop done
      • Characterization is ongoing
    • ASC preparation
      • Sensing matrix measurements
      • Offset evaluation
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4
  • 出張PEM injection (planning form)

Jurnal paper issue

Details are here!

Preparation for O4

  • Weather station
    • Weather in KAGRA entrance
    • New weather station
    • Calibration
  • Investigation of the PEM injection is just started
    • New DAC preparation
    • Acoustic injection at PSL/IMMCS/X/Y-end
    • Magnetic injection (After Washimi-san visiting to Virgo)
    • Portable PEM injectors
  • Voltmeter preparation
    • We made the PEM channel
      • K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
      • K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
    • Need the AC power monitor?
  • Schumann resonance outside
    • Measured from end of Aug.
    • Position slightly changed
      • X(to be the angle between X and Y to 90 deg)
      • Z(-10 cm)
    • Prepared the AC power supply and LAN cable
    • Start the measurement of the electric field
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Miyamoto
    • Weather analysis
  • Kume
    • Report of paper progress
  • Fukunaga
    • Schumann resonance
  • Kiyota
    • Power line noise investigation
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • Report the Virgo/ET visiting
  • Yokozawa
    • Discussion in F2F meeting

Place for memo

KAGRA/Subgroups/PEM/Meeting/221216/Agenda (last edited 2022-12-16 18:37:05 by tatsuki.washimi)