Line 2: Line 2:
 * 2023/02/17(Fri) 17:00-  * 2023/02/24(Fri) 17:00-
Line 7: Line 7:

 * Tasklist 2023 application
  * Deadline : 2/22(Wed) 17:00(JST)
  * Based on this application, we will discuss the author list end of this year, please submit your task.
  * If you plan to submit PEM tasks, please contact to Yokozawa and Washimi-san
Line 32: Line 26:
  * Deadline abstract submission 20th Feb(?)   * Yokozawa will present about KAGRA PEM
Line 66: Line 60:
  * Miyamoto (2/12-18)
Line 73: Line 66:
 * PRFPMI with AS17 + OMC DC readout done  * PRFPMI locked
Line 75: Line 68:
  * Future work
   * Vibration effect to OMC leg
   * Feedforward MICH/PRCL to DARM
   * Check the scattering light
   * Improve the suspension control
   * Alignment sensing and control
  * ~30 min with current best sensitivity
  * Noise hunting
   * MICH and PRCL feed forward implementation
    * MICH done, PRCL ongoing
   * Vibration of OMC leg
    * Investigation done, hunting ongoing
   * Turn off instrument
    * TMP and related pumps off
    * FFUs, coolers, dry air
    * Temperature control difficult
    * Will stop more instruments
   * Vibration and sound around
    * Some peaks disappeared after stopped the TMP
    * Several peak remained with CARM related
    * Hammering test to optical table, chamber, beam duct and chamber leg, ...
   * Noise budget evaluation
    * MICH, PRCL, CARM, Intensity, etc
Line 82: Line 86:
    * Control filter optimization
   * Suspension control
    * Now evaluating the suspension control noise
     * IMC's -> much less than sensitivity curve
     * PR's ongoing
     * BS : suspect point
Line 92: Line 102:
   * Received the accept from CQG
Line 106: Line 117:
 * Investigation of the PEM injection is just started
  * Acoustic injection preparation
   * Portable + SR3 PEM system recovery
  * Magnetic injection
   * After O4a?
 * Many portable accelerometer to chamber and beam ducts
  * Checking the vibration effect from vacuum pumps
  * Evaluating the effect to OMC leg
  * Remove after hammering test
Line 116: Line 126:

 * Investigation of the PEM injection is just started
  * Acoustic injection preparation
   * Output sound smaller compared from O3GK's
  * Magnetic injection
   * After O4a?
Line 123: Line 139:
   * Prepared
  * DC power monitoring
   * Arrived at Kamioka
Line 163: Line 182:
  * VK mag
Line 167: Line 185:
  * Current commissioning   * Vibration around OMC area [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14836|JGWDoc14836]]

Weekly PEM meeting

General announcement

  • KAGRA visiting plan
    • Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa
  • SEO budget
    • For maintenance, observation and toward O5

Meeting and Conference issue

  • JPS meeting (Online)
    • Registration : Finished
      • Washimi(Schumann resonance)
      • Fukunaga(Schumann resonance)
      • Miyamoto(Weather)
  • ICRC 2023
    • Nagoya
    • Deadline 2/20
    • url

  • Yokozawa will present about KAGRA PEM
  • 電離層とシューマン共振スペクトルの時間変動
    • 2/21(Tue) 16:00-
  • LVK meeting
    • 13 - 16 Mar
    • url

  • ILANCE conference
    • 27 - 30 Mar
    • Kyoto University
    • url

  • GWADW 2023
    • 21 - 27 May, Elba, Italy
    • One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
    • The 3rd generation can be a large topics because ET is now proceeding.
  • LVK Meeting
    • 11 - 14 Sep.
    • Toyama, Japan
  • 10th KIW
    • 29,30th May
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • Fukunaga (2/20-2/24)
  • From Kamioka
    • No

General issue

  • PRFPMI locked
    • 1.2 W output from IMC (7 W when O3GK)
    • ~30 min with current best sensitivity
    • Noise hunting
      • MICH and PRCL feed forward implementation
        • MICH done, PRCL ongoing
      • Vibration of OMC leg
        • Investigation done, hunting ongoing
      • Turn off instrument
        • TMP and related pumps off
        • FFUs, coolers, dry air
        • Temperature control difficult
        • Will stop more instruments
      • Vibration and sound around
        • Some peaks disappeared after stopped the TMP
        • Several peak remained with CARM related
        • Hammering test to optical table, chamber, beam duct and chamber leg, ...
      • Noise budget evaluation
        • MICH, PRCL, CARM, Intensity, etc
      • Interferometer characterization
        • Control filter optimization
      • Suspension control
        • Now evaluating the suspension control noise
          • IMC's -> much less than sensitivity curve

          • PR's ongoing
          • BS : suspect point
      • Increased the laser power
  • 出張PEM injection (planning form)

Jurnal paper issue

Details are here!

  • ICA for E-run/O3GK (Kume, Kobayashi)
  • Micro seismic analysis (Hoshino)
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
    • Re-measurement before O4?
  • Tonga GIF paper
    • Playground application

Preparation for O4

  • Many portable accelerometer to chamber and beam ducts
    • Checking the vibration effect from vacuum pumps
    • Evaluating the effect to OMC leg
    • Remove after hammering test
  • Finalize the PEM installation
    • Accelerometer to C chamber and TMS table
    • Microphone to C chamber
      • Do we need both booth and field?
  • Investigation of the PEM injection is just started
    • Acoustic injection preparation
      • Output sound smaller compared from O3GK's
    • Magnetic injection
      • After O4a?
  • Voltmeter preparation
    • We made the PEM channel
      • K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
      • K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
    • AC power monitoring
      • Bought transreducer
      • Prepared
    • DC power monitoring
      • Arrived at Kamioka
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Miyamoto
    • Weather analysis
  • Kume
    • Report of paper progress
  • Fukunaga
    • Schumann resonance
  • Kiyota
    • Power line noise investigation
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • PRFPMI OMC leg
  • Yokozawa