Differences between revisions 4 and 5
Revision 4 as of 2023-03-09 13:14:22
Size: 893
Comment:
Revision 5 as of 2023-03-09 17:40:36
Size: 893
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
 * Virgo status (Irene)
Line 21: Line 22:
 * Virgo status (Irene)  * Status of KAGRA Schumann resonance study
  * Underground/outside Virgo site (Washimi)
  * Long term stability (Fukunaga)
Line 26: Line 29:
 * Status of KAGRA Schumann resonance study
  * Long term stability (Fukunaga)
  * Underground/outside Virgo site (Washimi)

Virgo-KAGRA PEM meeting

Agenda

  • Publication issue
    • O3GK ICA Paper
    • Seismic motion paper
      • Writing
  • KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)pdf

  • Virgo status (Irene)
  • Status of KAGRA Schumann resonance study
    • Underground/outside Virgo site (Washimi)
    • Long term stability (Fukunaga)
  • Status of Virgo Schumann resonance study
    • Status (Francesca)
  • Others
    • Future PEM meeting

KAGRA/Subgroups/PEM/Meeting/230309/Agenda (last edited 2023-03-13 08:39:27 by TakaakiYokozawa)