Differences between revisions 5 and 6
Revision 5 as of 2023-12-22 17:05:01
Size: 5151
Comment:
Revision 6 as of 2023-12-22 17:07:42
Size: 5398
Comment:
Deletions are marked like this. Additions are marked like this.
Line 36: Line 36:
Line 43: Line 42:

  * LBGT@Tokokoku
     * https://www.lowbg.org/ugap/ws/lb2023/index.html
     * workshop of underground experiments
     * Washimi will have a presentation of rain, snow, underground water
     * Miyamoto-kun will have a poster presentation.

Weekly PEM meeting

General announcement

  • 2023年も大変お世話になりました。
    • PEM subsystemは今年もたくさんの結果を残すことができました。ありがとうございます。
    • 2024年もよろしくお願いします。
  • Kamioka visiting plan
    • Yokozawa and Washimi-san have several budgets (共同利用)
      • So we want to call not only PEM members but also KAGRA members who are interested in onsite.
      • If you want to visit Kamioka, please contact Yokozawa
    • Hoshino & Sato will stai Kamioka on February (3weeks?)

  • O4b
    • Break : mid-January - mid-March, 2024
    • Virgo : will join in March
    • KAGRA : Three-month observation around here
  • O4a noise budget paper
    • If you have a plan to write the paper using O4a data and PEM, please let me know.

Meeting and Conference issue

If you have some presentation about PEM related, please contact to me.

Business travel (except for conferences)

  • To Kamioka
    • Hoshino (February?)
    • Sato (Febryary?)
  • From Kamioka
    • No plan

General issue

  • Strategy (JGWDoc15522)

  • Cooling down
    • IX,EX,EY : Radiation shield cooling down : 84-88 K
    • EY : Started the cooling down duct shield
      • 200 K
    • Temperature change url

    • After starting the cooling down after measuring the Q-value of sapphire fiber
  • Interferometer operation
    • PRFPMI DC readout Succeeded
      • Need to reuducing the DARM RMS to be stable operation
        • Resonant frequency measurement
        • Wideband ASC
        • Treatment for large micro-seismic
    • Initial alignment procedure
      • Touch the alignment of GRX and GRY
  • Q value measurement
    • Mirror Q value measurement at IX, EX, EY
    • Suspension (violin) Q value measurement
  • New IP control
    • Ongoing
  • Strategy for noise hunting

Jurnal paper issue

Details are here!

  • Micro seismic analysis (Hoshino)
  • Acoustic reverberation time paper (Washimi+, Sato?)
    • Suspend
    • Re-measurement before O4?
  • TCam paper
    • Writing ongoing

Preparation for O4b

  • Snow monitor
    • Ongoing
  • PEM installation
    • Waiting the timing of TMSX and TMSY
  • Evaluation of newtonian noise
    • Anoop and Washimi
  • Investigation of the PEM injection
    • Magnetic injection
  • Voltmeter preparation
    • AC power monitor installation
    • DC power monitor installation

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Hoshino
    • Seismic motion analysis
  • Sato
    • Sound source analysis
  • Miyamoto
    • Weather analysis
  • Takatani
    • Noise subtraction with machine learning
  • Kume
    • PR3 line injection klog25670

    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • Magnetic field analysis
    • Snow monitor
  • Yokozawa
    • Noise budget in current IFO

Place for memo

KAGRA/Subgroups/PEM/Meeting/231222/Agenda (last edited 2023-12-22 17:07:42 by tatsuki.washimi)