Differences between revisions 56 and 57
Revision 56 as of 2018-12-10 12:38:23
Size: 1757
Editor: KousekiMiyo
Comment:
Revision 57 as of 2018-12-10 12:39:01
Size: 2042
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:

== Definition and scope ==
 1. ~+Construction of 2 fixed-mirror interferometers along KAGRA, for both __'''geophysical observation'''__ and __'''KAGRA baseline monitor'''__.+~
 2. ~+Arrangement of __'''environment sensors'''__ for monitoring the tunnel, rooms, and instruments.+~

Physical Environment Monitors (PEM) Subgroup

Meeting

General

Projects

Tasks

Documents

Link

Meeting

KAGRA PEM Channels

PEM Selection

Short term tasks

PEM plan(pdf)

LIGO PEM

KAGRA PEM Lists

PEM Installation

Long term

Usefull KnowHow

Monitors information

Oct. 2018 X-arm commissioning

ADC and Racks for PEM

Rack and cabling check

SummaryPage

All PEM equipments

PEM JGWdoc Tree

PEM tasks

Member list

Chief:

  • 横澤 孝章 Takaaki Yokozawa (ICRR)

Sub-Chiefs:

  • (To be discussed)

Definition and scope

  1. Construction of 2 fixed-mirror interferometers along KAGRA, for both geophysical observation and KAGRA baseline monitor.

  2. Arrangement of environment sensors for monitoring the tunnel, rooms, and instruments.

KAGRA/Subgroups/PEM (last edited 2023-11-08 14:27:12 by tatsuki.washimi)