Differences between revisions 57 and 58
Revision 57 as of 2018-12-10 12:39:01
Size: 2042
Editor: KousekiMiyo
Comment:
Revision 58 as of 2018-12-10 12:39:51
Size: 1798
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 29: Line 29:
 1. ~+Construction of 2 fixed-mirror interferometers along KAGRA, for both __'''geophysical observation'''__ and __'''KAGRA baseline monitor'''__.+~
 2. ~+Arrangement of __'''environment sensors'''__ for monitoring the tunnel, rooms, and instruments.+~
 1.
2 .

Physical Environment Monitors (PEM) Subgroup

Meeting

General

Projects

Tasks

Documents

Link

Meeting

KAGRA PEM Channels

PEM Selection

Short term tasks

PEM plan(pdf)

LIGO PEM

KAGRA PEM Lists

PEM Installation

Long term

Usefull KnowHow

Monitors information

Oct. 2018 X-arm commissioning

ADC and Racks for PEM

Rack and cabling check

SummaryPage

All PEM equipments

PEM JGWdoc Tree

PEM tasks

Member list

Chief:

  • 横澤 孝章 Takaaki Yokozawa (ICRR)

Sub-Chiefs:

  • (To be discussed)

Definition and scope

2 .

KAGRA/Subgroups/PEM (last edited 2023-11-08 14:27:12 by tatsuki.washimi)