Line 5: Line 5:
 * Cling wrap in BF.
 * Temporary ballast mass in BF.
 * Galled pole in BF level of EQ stop.
 * Temporary geophone cables.
 * Remove cling wrap in BF and install vacuum-compatible heat shrink.
 * Swap out temporary ballast mass in BF.
 * If possible, fix galled pole in BF level of EQ stop.
 * Swap in final geophone cables.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

KAGRA VIS - Type B - BS Test Hang Issues

Things to remember/fix after BS Test Hang, before final hanging of BS.

  • Remove cling wrap in BF and install vacuum-compatible heat shrink.
  • Swap out temporary ballast mass in BF.
  • If possible, fix galled pole in BF level of EQ stop.
  • Swap in final geophone cables.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.