Line 8: Line 8:
 * Swap out temporary ballast mass in BF.  * Swap out temporary ballast mass in BF, SF.
 * Adjust height of crossbars below BF.
Line 14: Line 15:
 * Adjust yoke on BF to put top of secondary at 6 mm above top of baseplate (or to give 0 counts at nominal height).
Line 17: Line 19:
 * BF GAS spring  * BF GAS spring rebuild?
Line 19: Line 21:
 * Tighten PI yaw return spring.

KAGRA VIS - Type B - BS Test Hang Issues

Things to remember/fix after BS Test Hang, before final hanging of BS.

  • Remove cling wrap in BF and install vacuum-compatible heat shrink.
  • Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).
  • Rewire PI horizontal steppers with vacuum-compatible cable.
  • Swap out temporary ballast mass in BF, SF.
  • Adjust height of crossbars below BF.
  • If possible, fix galled pole in BF level of EQ stop.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
  • Reclean stuff:
    • PI (remove Kapton tape etc, etc).
    • LLB damper stuff, especially Cu segments.
  • Adjust yoke on BF to put top of secondary at 6 mm above top of baseplate (or to give 0 counts at nominal height).
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
  • BF GAS spring rebuild?
  • Check inside SF for lost ruler.
  • Tighten PI yaw return spring.