Line 2: Line 2:
Line 8: Line 7:
Line 10: Line 8:
  * Slides   * [[attachment:CLIO-LISM-TAMA-KAGRA3000.pdf|Slides]]
Line 17: Line 15:
  * Two suspensions with coils will be used for the filter cavity experiment    * Two suspensions with coils will be used for the filter cavity experiment
Line 22: Line 20:
  * One of the TAMA PRMs is used for the filter cavity experiment. If we use this mirror, they need something instead -> LISM mirror (ask Ohashi-san)     * One of the TAMA PRMs is used for the filter cavity experiment. If we use this mirror, they need something instead -> LISM mirror (ask Ohashi-san)

VIS special meeting on iKAGRA ETM and PR2

2016/1/6 14:00 - 15:45

Participants: Fabian, Tatsumi, Suzuki, Raffaele, Shoda, Takahashi, Tomaru, Aso, Mark, Akutsu, Fujii

Agenda Items

  • Proposed plans (Aso)
    • Slides

    • Two descoping options are proposed
      • Use TAMA PRM with TAMA suspension as iKAGRA ETMs
      • Use fixed PR2
  • TAMA suspension status (Takahashi)
    • There exist 5 TM type suspensions in TAMA
    • Two of them have coils, others not.
    • Two suspensions with coils will be used for the filter cavity experiment
    • We need to make coils and associated parts
    • Some of the suspensions were stored in the air for a long time. We need to clean them first.
    • Tatsumi-san already got a quotation for coil bobins: delivery date 1/25
    • We can use D-sub instead of BNC, so that we can also use in-vac cables prepared for ETMs.
    • One of the TAMA PRMs is used for the filter cavity experiment. If we use this mirror, they need something instead -> LISM mirror (ask Ohashi-san)

Conclusions

  • VIS team agrees to the two descoping plans proposed by SEO
  • ETM
    • NAOJ will take care of the preparation of the TAMA suspensions back to the original state. The rest of the installation work should be led by other people (e.g. Uchiyama-san). Aso will consult with SEO about this responsibility separation.
    • The following items are identified as the NAOJ tasks for the suspension preparation
      • Check the current status
      • Wash existing parts
      • Order missing parts
      • Coil winding
      • Send parts to Kamioka
      • Assemble the suspensions at Kamioka
    • The task assignment was discussed between Aso and Takahashi. They will contact people to get their agreement. Then the task assignment will be announced soon.
    • The filter cavity experiment needs a replacement mirror for the PRM. Aso will ask Ohashi-san about the LISM mirror.
  • PR2
    • The preparation and installation of the fixed mirror will not be done by the VIS people.
    • We need to consider how to effectively use the released man power for the preparation of bKAGRA suspensions -> to be discussed at the regular VIS meeting.

    • We need to secure and cover up the current PR2 assembly set up (Mark, Fabian)