Differences between revisions 1 and 10 (spanning 9 versions)
Revision 1 as of 2016-08-17 15:16:51
Size: 6479
Editor: YoichiAso
Comment:
Revision 10 as of 2016-08-19 13:34:09
Size: 6669
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
Participants: Participants:Takahashi, Sato, Ishizaki, Tanaka, Shoda, Mark, Ohishi, Aso, Fabian, Zhao
Line 7: Line 7:
Schedule Chart ([[https://www.dropbox.com/s/a8lc5wyk67m8i6r/VIS%20Overall%20Schedule-20160805.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/bwwenn26jzyg9kn/VIS%20Overall%20Schedule-20160805.mpp?dl=0|MPP]]) Schedule Chart ([[https://www.dropbox.com/s/g1t88ygow3iub84/VIS%20Overall%20Schedule-20160817.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/nn349ssjnu8aegh/VIS%20Overall%20Schedule-20160817.mpp?dl=0|MPP]])
Line 11: Line 11:
 * Simulation: Calculating horizontal-yaw couplings from the asymmetry. '''Send the results by 8/10 (Okutomi).'''
 * EQ stop: The date for the announce of bidding is the 17th. The specification document and drawings should be fixed by the 10th.
 * Installation procedure: The document is under preparation. The review will be held on the 10th.
 * LVDT test bench was ordered.
 * Dummy payload design is done. Ishizaki-san is making 2D drawings. To be ordered with the EQ stops.
 * Drawings for the release sensor were finished. To be ordered with the EQ stops.
 * Task list was updated.
 * No type-A meeting in this week.
 * EQ stop, release sensor, dummy payload: The specification document and drawings were fixed. The bidding was announced on the 17th.
 * Installation procedure: The review was held on the 10th.
 * Standard filters: Cheking of 6 sets were finished and shipped to Kamioka.
 * BF damper: LVDT sample is under testing. The measured noise is too large (10^-6 m/rtHz).
Line 19: Line 19:
  ==== Discussions ====
 * Dummy BS gluing will be done in the next week
 * Type-B team will start working in Kamioka from 8/15
 * Zhao-kun will help us from 8/15
 * Will ask Yokokawa-kun (Toyama University) for help from 8/22 - 9/16 (Aso)
 * Will discuss with Liu-kun about the possibility of doing Type-B simulation at the F2F meeting
 * The real BS mirror is ready. We can do the gluing work whenever we want.

==== Type B Past Week Summary ====
  * Akutsu-san provided a set of cleanroom gear (shoes only slightly too tight!) for use by Mark this week. (And Sakamoto-san sent two more sets from Kamioka to Kashiwa!)
  * Fabian did a fit test of the winches onto the IM.
  * The RM, IM and IRM were weighed, and wrapped/packed for shipment to Kamioka.
  * Mark made a checklist of all the parts of the BS mirror box and gluing jig, to help with collecting the parts from Kashiwa.
  * Mark, Fabian and Hirata-san retrieved the dummy BS and mirror box from Kashiwa. The dummy BS was stripped of accessories and moved to the ATC fume hood. A combination of acetone and a stainless steel brush was effective in removing the residual glue in the first area worked on.
  * Fabian designed an extra 600 g of trim masses for the IM and Hirata-san made drawings. Fukushima-san of ATC made some suggestions for improvement and Fabian will add them. The design allows for the masses to be added to the IM even after it has been placed in the assembly frame and the dummy optic and RM have been hung, so it should not delay work.
  * Mark worked on the schedule, making the next few weeks more realistic and incorporating the new plan for the SR RMs (the test will be used for SR2 but two more will be made from scratch next financial year).
 * Type B Past Week Summary - week of 8/8
  * Mark, Fabian and Hirata-san cleaned glue off the dummy BS, attached Akutsu-san's new SS mirror plates, reglued the flags and prisms, and removed the gluing hardware, so the dummy BS is ready for shipping. Tatsumi-san's refinements to the tooling (especially the new flag holders) worked very smoothly. We were more generous with the glue and much more careful with the alignment of the prisms to the barrel, both during rehearsal and the final gluing.
  * Mark wrote up the gluing procedure as a new document [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5505| E1605505]]. (The original plan was to do an addendum to Tatsumi-san's PR gluing procedure JGW-E1504248, but there was too much material.)
  * Hirata-san organized with Takahashi-san to get the BS payload masses shipped to Kamioka. They will go in an air-ride truck on Wed 8/17 together with a load of Type A stuff, and will arrive early on Thu 8/17.
  * Hirata-san shipped the collection of Type B fasteners to Kamioka, to arrive Mon 8/15.
  * Hirata-san measured another standard filter and cleaned various parts for people.
  * Hirata-san worked on the SR2 Inventor assembly. He spotted a problem with the orientation: given the position of the pistons in the SR2 tank (according to the assembly from Mirapro), mating the standard Type B SR chain and the chamber in the natural way puts the optic at 90° to what it needs to be. A similar problem was found in the Type B Test at Mitaka, and it was eventually worked around, but with some difficulty. Hirata-san will investigate the best way of making a correction.
  * Komori-kun, Kuwahara-kun and Akutsu-san calibrated an initial batch of 7 wide-mouthed OSEMs.
Line 37: Line 28:
  * Hirata-san washed 7 OSEMs for Akutsu-san, and various other parts for Yamamoto-san of ICRR.
  * Hirata-san removed the remaining glue from the BS primary and secondary prisms, as well as the prisms removed from the PR hanging test mirror. (The small sapphire prisms for the PR were not intended to be reused and one had already broken at Kashiwa, but the metal PR secondaries can and will be used again.)
 * Type B Past Week Summary - week of 8/15
  * Hirata-san shipped the fasteners to Kamioka, and they arrived Tuesday.
  * Hirata-san shipped a large load of Type A and Type B items, which Mark and Fabian received on Thursday 8/18.
  * Akutsu-san shipped the first 7 OSEMs.
  * Hirata-san and Ikenoue-san did a successful function test of the BS winches with the new clamp parts for the thicker wires.
  * Mark, Fabian and Zhao-kun did a major cleanup and reorganization of the BS clean booth at Kamioka, putting PR2 stuff in boxes, vacuuming and wiping, and making space.
  * Mark, Fabian and Zhao-kun set the crossbeams of the assembly frame to their correct positions and installed the EQ stop ring and IM. This is the first actual installation activity for Type B.
  *
Line 41: Line 37:
  * OSEMs
   * Akutsu-san is working to get wide-mouth OSEMs ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1853|2 assembled]]; another few were assembled and a batch of 7 were washed.
  * Longer cables for BF->PI and SF->PI.
   * Connectors RECEIVED, cables being made.
  * Lower breadboard stuff
   * Installation to be incorporated into the procedure document. Mark/Takahashi to discuss.
  * Documents
   * BS Assembly Procedure [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4235|E1504235]], [[https://onedrive.live.com/redir?resid=D5CCFA70A378E0D0!195&authkey=!AM_usynuo9QI57g&ithint=folder,webloc|E1504235 draft]]
 * To-do list during Mark's vacation
  * Weigh IM/RM/IRM (Fabian, Hirata) - DONE
   * New trim mass - ORDERED.
  * Pack/ship IM/RM/IRM to Kamioka (Hirata/Fabian) - READY TO SHIP.
  * Analyze geophone data (Fabian/Shoda) - DONE.
  * Remove glue from dummy BS face (Fabian) - MOSTLY DONE.
  * Reglue flags and prisms (Tatsumi, Fabian) - from Friday 8/5.
  * Clean wire for BS and RM (Hirata) - DONE
  * Get new winch parts for new wire diameters - ORDERED, expected 8/5.
  * Do fit/function test of winches (Fabian/Hirata) - fit test DONE, function test from 8/8
  * Ship winches to Kamioka (Hirata/Fabian)
  * Work on BS simulation (Fabian)
  * Longer cables for BF->PI and SF->PI still not received, Takahashi-san to check status.
 * Longer term to-do list
  * Decide position of BS rack (in consultation with Miyakawa-san) - document in progress: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5413| T1605413]]
Line 63: Line 42:
  * Write more of main assembly procedure (Mark) - ONGOING
 * Longer term to-do list
  * Write more of BS Assembly Procedure [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4235| E1504235]], [[https://onedrive.live.com/redir?resid=D5CCFA70A378E0D0!195&authkey=!AM_usynuo9QI57g&ithint=folder,webloc|E1504235 draft]] (Mark) - ONGOING
  * Lower breadboard installation to be incorporated into the procedure document.
  * Work on BS simulation (Fabian)
Line 72: Line 52:
 * Updated the document tree for Type-Bp
 * Mirapro sent us the design of the assembly frame -> seems OK
 * Asked Mirapro to design the optical bench adapter
 * Obuchi-san did the structural analysis of the BF damper part. BFRM has 40Hz lowest resonance. Do simulation to see if this will be a problem or not.
 * Simulation: Checked the damping time without local damping
 * LVDT check: Working with Sakon-san to test the Virgo LVDT-Actuator
 * Type-Bp modification
  * Saito-san made the 1st version of the 2D drawing. Though we still have small modification, we can start cost estimate.
 * F7 LVDT
  * Virgo LVDT test is ongoing. The measured calibration factor and noise level is worse than expected. More tuning is required.
 * Installation related issues
  * BF weight is lighter than the 3D model. (CAD: 50 kg, measured: 45 kg.) Shoda has not been able to find any reason yet. Further investigation will be done in next week.
  * Mirapro sent us the design of the optical bench installation jigs. We sent them some request for the update.
  * The design of the assembly frame is almost fixed.
 * Simulation and others
  * None

 * '''A/I'''
  * Investigate the BF weight inconsistency (Shoda)
  * Some 2D drawings not related to the modification (additional masses, OB wire hook, OB wires,,,) (Hirata)
  * Assembly drawing (Shoda)
  * Optical bench additional parts design
  * Organize the mirror preparation
Line 80: Line 71:
 * Started the preparation of work place in the clean room to test the magnet gluing jigs.  * Put a report here
Line 83: Line 74:
 * About the connection and system boundary of the host system.[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0054/E1605459/001/Project_WDS-Ex-I_O-Design160805.pdf|PDF]]  * Put a report here
Line 86: Line 77:
 * No issue  * Any issue ?
Line 89: Line 80:
 * Installation order for Type-B and Type-Bp
  * BS(1-3) -> SR3(3-7) -> SR2(7-11) -> SRM (11-)
  * PR3 (12-3) -> PR2(3-5) -> PRM(5-7)
Line 91: Line 85:
 * Mon: Check existing parts (Shoda)
 * Tue: Check existing parts (Shoda)
 * Wed: Check existing parts (Shoda)
 * Thu:
 * Fri:
 * Mon: BS test hanging (Mark, Fabian, Zhao)
 * Tue: BS test hanging (Mark, Fabian, Zhao)
 * Wed: BS test hanging (Mark, Fabian, Zhao)
 * Thu: F2F
 * Fri: F2F
Line 98: Line 92:
 * Travel (Week of 8/8):  * Travel (Week of 8/22):
Line 100: Line 94:
  * Shoda: 8-10
  * Mark:
  * Fabian:
  * Shoda:
  * Mark: 22-26 ?
  * Fabian: 22-26 ?
Line 110: Line 104:
 * Travel (Week of 8/15):
  * Takahashi:
 * Travel (Week of 8/29):
  * Takahashi: 30 - 9/2 ?
Line 113: Line 107:
  * Mark: 15-19
  * Fabian: 15-19
  * Mark: 29 - 9/2 ?
  * Fabian: 29 - 9/2 ?
Line 119: Line 113:
  * Sato:   * Sato: 30 - 9/2 ?
Line 123: Line 117:
2016/8/19(Fri) 13:30 - 2016/9/2(Fri) 13:30 -

Next F2F 2016/9/9 ?

Agenda/Minutes of the VIS Meeting on 2016/8/19

2016/8/19 13:30 - @ Room 210

Participants:Takahashi, Sato, Ishizaki, Tanaka, Shoda, Mark, Ohishi, Aso, Fabian, Zhao

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Task list was updated.
  • No type-A meeting in this week.
  • EQ stop, release sensor, dummy payload: The specification document and drawings were fixed. The bidding was announced on the 17th.
  • Installation procedure: The review was held on the 10th.
  • Standard filters: Cheking of 6 sets were finished and shipped to Kamioka.
  • BF damper: LVDT sample is under testing. The measured noise is too large (10^-6 m/rtHz).

Type-B (Mark)

  • Type B Past Week Summary - week of 8/8
    • Mark, Fabian and Hirata-san cleaned glue off the dummy BS, attached Akutsu-san's new SS mirror plates, reglued the flags and prisms, and removed the gluing hardware, so the dummy BS is ready for shipping. Tatsumi-san's refinements to the tooling (especially the new flag holders) worked very smoothly. We were more generous with the glue and much more careful with the alignment of the prisms to the barrel, both during rehearsal and the final gluing.
    • Mark wrote up the gluing procedure as a new document E1605505. (The original plan was to do an addendum to Tatsumi-san's PR gluing procedure JGW-E1504248, but there was too much material.)

    • Hirata-san organized with Takahashi-san to get the BS payload masses shipped to Kamioka. They will go in an air-ride truck on Wed 8/17 together with a load of Type A stuff, and will arrive early on Thu 8/17.
    • Hirata-san shipped the collection of Type B fasteners to Kamioka, to arrive Mon 8/15.
    • Hirata-san measured another standard filter and cleaned various parts for people.
    • Hirata-san worked on the SR2 Inventor assembly. He spotted a problem with the orientation: given the position of the pistons in the SR2 tank (according to the assembly from Mirapro), mating the standard Type B SR chain and the chamber in the natural way puts the optic at 90° to what it needs to be. A similar problem was found in the Type B Test at Mitaka, and it was eventually worked around, but with some difficulty. Hirata-san will investigate the best way of making a correction.
    • Komori-kun, Kuwahara-kun and Akutsu-san calibrated an initial batch of 7 wide-mouthed OSEMs.
    • Fabian worked on the payload assembly procedure.
  • Type B Past Week Summary - week of 8/15
    • Hirata-san shipped the fasteners to Kamioka, and they arrived Tuesday.
    • Hirata-san shipped a large load of Type A and Type B items, which Mark and Fabian received on Thursday 8/18.
    • Akutsu-san shipped the first 7 OSEMs.
    • Hirata-san and Ikenoue-san did a successful function test of the BS winches with the new clamp parts for the thicker wires.
    • Mark, Fabian and Zhao-kun did a major cleanup and reorganization of the BS clean booth at Kamioka, putting PR2 stuff in boxes, vacuuming and wiping, and making space.
    • Mark, Fabian and Zhao-kun set the crossbeams of the assembly frame to their correct positions and installed the EQ stop ring and IM. This is the first actual installation activity for Type B.
  • Type B ongoing issues
    • Longer cables for BF->PI and SF->PI still not received, Takahashi-san to check status.

  • Longer term to-do list
    • Decide position of BS rack (in consultation with Miyakawa-san) - document in progress: T1605413

    • Do Inventor assembly for SR2 in chamber and on assembly frame (Hirata) - ONGOING.
    • Write more of payload assembly procedure (Fabian) - ONGOING
    • Write more of BS Assembly Procedure E1504235, E1504235 draft (Mark) - ONGOING

    • Lower breadboard installation to be incorporated into the procedure document.
    • Work on BS simulation (Fabian)
    • Do BS Simulink model (Mark, Kokeyama)
    • Do 2D drawings of SR2 parts (Hirata)
    • Redesign SRx IM wire clamps for larger prisms, remachined RMs
    • Order SRM/PRM parts (Hirata/Shoda)
    • Order SRx fasteners (Hirata)

Type-Bp (Shoda)

  • Type-Bp modification
    • Saito-san made the 1st version of the 2D drawing. Though we still have small modification, we can start cost estimate.
  • F7 LVDT
    • Virgo LVDT test is ongoing. The measured calibration factor and noise level is worse than expected. More tuning is required.
  • Installation related issues
    • BF weight is lighter than the 3D model. (CAD: 50 kg, measured: 45 kg.) Shoda has not been able to find any reason yet. Further investigation will be done in next week.
    • Mirapro sent us the design of the optical bench installation jigs. We sent them some request for the update.
    • The design of the assembly frame is almost fixed.
  • Simulation and others
    • None
  • A/I

    • Investigate the BF weight inconsistency (Shoda)
    • Some 2D drawings not related to the modification (additional masses, OB wire hook, OB wires,,,) (Hirata)
    • Assembly drawing (Shoda)
    • Optical bench additional parts design
    • Organize the mirror preparation

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Any issue ?

Discussion

  • Installation order for Type-B and Type-Bp
    • BS(1-3) -> SR3(3-7) -> SR2(7-11) -> SRM (11-)

    • PR3 (12-3) -> PR2(3-5) -> PRM(5-7)

Site work plan for the next week

  • Mon: BS test hanging (Mark, Fabian, Zhao)
  • Tue: BS test hanging (Mark, Fabian, Zhao)
  • Wed: BS test hanging (Mark, Fabian, Zhao)
  • Thu: F2F
  • Fri: F2F

Travel Plans

  • Travel (Week of 8/22):
    • Takahashi:
    • Shoda:
    • Mark: 22-26 ?
    • Fabian: 22-26 ?
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 8/29):
    • Takahashi: 30 - 9/2 ?
    • Shoda:
    • Mark: 29 - 9/2 ?
    • Fabian: 29 - 9/2 ?
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato: 30 - 9/2 ?
    • Ohishi:

Next meeting

2016/9/2(Fri) 13:30 -

Next F2F 2016/9/9 ?

KAGRA/Subgroups/VIS/VISMinutes20160819 (last edited 2016-08-19 16:18:57 by NaokoOhishi)