Agenda/Minutes of the VIS Meeting on 2017/2/17

2017/2/17 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

Type-A (Takahashi)

Past week report

  • Installation in Y-end:

13th(Mon)

  • Installed the protection net to the bottom of cross tube.
  • Released the keystone of BF. The weight of dummy payload was near the optimal load of BF.

14th(Tue)

  • Tuned the weight of dummy payload.
  • Started cabling around the BF and the dummy payload. Finished on 16th.

15th(Wed)

  • Started making the short cable for the LVDT on BF. Not finished.
  • Prepared the LVDT driver with the oscillator and the oscilloscope. 16th(Thu)
  • Cariblated the LVDT on BF.
  • Checked the range of FR on BF. It was about 2mm. Additional blades are necessary.
  • Maraging wire: The 3.3m wire will be treated at Himeji facility of Kinzoku-giken. It takes one month.

Plan for coming weeks

  • Adjust the BF.
  • Assemble the BF damper.
  • Assemble the EQ stop for F3 and set the F3.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Items that have been delivered.
    • PCB + Metal mask( for Main board(WSD) )
    • Cream solder
  • Redesign(Front panel board for Main 4ch WDS Box and front panel for Ex-I/O Box)Adjust the spacing of the front panel conectors.

Plan for coming weeks

  • I'm planning to perform surface mounting for Power board(WDS Main 4ch Box) in reflow furnace in Akihabara.Since a large PCB size( 320mm * 100mm) is required,a large reflow furnace is necessary,so it can be borrowed in Akihabara(DMM-make site.And of course,paid).
    • ref Peripheral board(Power)PDF

    • ref Reflow furnaceJapanese

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • Mirror disassembly jigs (Hirata)

Travel Plans

  • Travel (Week of 2/20):
    • Takahashi: 20- 24
    • Shoda: 21 - 24
    • Mark: 20 - 24
    • Fabian: 20 - 24
    • Okutomi: 20 - 22
    • Fujii:
    • Ishizaki: 20 - 24
    • Hirata: 20 - 24
    • Sato: 20 - 24
    • Enzo: 20 - 24
    • Hashimoto (Hosei Univ.): 20 - 24
    • Ohishi:
    • Tanaka:
  • Travel (Week of 2/27):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Hashimoto (Hosei Univ.):
    • Someya (Hosei Univ.):
    • Ohishi:
    • Tanaka:

Next meeting

On 2017/2/24(Fri) in Mitaka

March VIS F2F: March 3