Differences between revisions 1 and 2
Revision 1 as of 2017-05-10 14:51:40
Size: 1587
Editor: YoichiAso
Comment:
Revision 2 as of 2017-05-12 11:49:49
Size: 1975
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
  *Start mounting on the 19 inch rack(Main 4ch WDS box).--> Working now.
Line 33: Line 35:
  *Ongoing
    *Mounting on the 19 inch rack(Main 4ch WDS box).-->Schedule to complete.
    *Start creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).
Line 34: Line 39:
  *Scheduled to start
    *I'll start formulating an experimental plan(First test) at the KAGRA site.
   

Agenda/Minutes of the VIS Meeting on 2017/5/12

2017/5/12 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Start mounting on the 19 inch rack(Main 4ch WDS box).--> Working now.

Plan for coming weeks

  • Ongoing
    • Mounting on the 19 inch rack(Main 4ch WDS box).-->Schedule to complete.

    • Start creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).
  • Scheduled to start
    • I'll start formulating an experimental plan(First test) at the KAGRA site.

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • JPS presentation

Travel Plans

  • Travel (Week of 5/15):
    • Takahashi: 15 - 19
    • Shoda: 15 - 18
    • Mark: 15 - 19
    • Fabian:15 - 19

    • Okutomi: 15 - 19
    • Fujii:
    • Ishizaki: 16 - 19
    • Hirata: 15 - 19
    • Sato: 16 - 19
    • Enzo: 16 - 19
    • Ohishi:
    • Tanaka:
    • Sekiguchi(Hosei): 16 - 19
    • Hirayama(Hosei): 16 - 19
  • Travel (Week of 5/22):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:
    • Tanaka:
    • Sekiguchi(Hosei):
    • Hirayama(Hosei):

Next meeting

On 2017/5/19(Fri)

VIS F2F: 5/26 (Fri)

KAGRA/Subgroups/VIS/VISMinutes20170512 (last edited 2017-05-12 16:59:38 by NaokoOhishi)