= Agenda/Minutes of the VIS Meeting on 2017/12/22 = 2017/12/22 13:40 - 14:40 Participants: Takahashi, Okutomi, Shoda, Sato, Ishizaki, Ohishi, Aso, Tanaka == Progress report == === Schedule Chart === Type-A : ([[TBD|PDF]],[[TBD|MPP]]) Type-B: ([[TBD|PDF]],[[TBD|MPP]]) * Type-A: * Type-B: === Type-A (Takahashi) === ==== Past week report ==== [X-end] * Prepared for the geophones with pods. * Mounted the geophones on the top filter. * Tuned the F0. * Tuned the IP. * Closed the top chamber. * Prepared for the power outage. [Y-end] * Opened the cup of BF. * Repaired the jamming of FR. * Aligned the cryo-payload by the yaw picomotor in BF. * Tested the FR in BF. The mirror can move +/- 2mm. * Closed the cup of BF. * Released the BF. * Tuned the F0, Adjusted the IP position and the yaw rotation on the TF. * Closed the top chamber. ==== Plan for coming weeks ==== * X-end: Start pumping down from Wednesday afternoon. === Type B (Mark) === ==== Past week report ==== * Mark created screens and a macro.txt file for the SR2 and linked to them from the VIS screen. * Enzo and Mark did a new overview screen for the BS. * Enzo added DIO cards to the rack and connected them to the coil drivers. * Fabian and Kozu-kun finished assembling the IM and tested the picos over their full range. * Mark and Hirata-san configured and aligned the assembly frame and optical table and craned in the IM ring. * Hirata-san noticed some oxidization on several of the L-brackets that will hold the IM horizontally, and we should get them cleaned or machined, but we can probably continue with hanging the system in the meantime. ==== Plan for week of 12/25 ==== * Power outage 12/25. * Mark, Enzo, Fabian vacation * Shoda-san, Kozu-kun, Hirata-san at Kamioka - Hirata-san from Tue, others TBD. * Recover after power outage. * Create SR2 real-time model. * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor). (Hirata-san) * Weigh IM (per Fabian's note in the paper log). * Remove L-brackets from bars on IM ring - send for cleaning/remachining. * Setup OL for checking pitch of SR. * Wipe/blow dust off SR2 frame. * Crane IM into frame. ==== Plan for week of 1/9 ==== * Mark, Fabian, Enzo, Shoda-san at Kamioka Tue-Fri. * Hang SR and RM. ==== Vacation Info ==== * Mark 12/22-1/3 * Enzo, 12/21-12/27 (but ''not'' 12/28) * Fabian 12/22-1/5 === Type-Bp (Shoda) === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM (Ohishi) === ==== Past week report ==== ==== Plan for coming weeks ==== === Watchdog system (Tanaka) === ==== Past week report ==== *Start ordering mass production version.-->Order request has been completed(To order the University of Tokyo). *Start other ordering.-->Completed(but some will be next year). *I reconfirmed the other necessary items.-->I made a list of orders for next year. ==== Plan for coming weeks ==== *The remaining orders(Next year). *Memorandum(For next year's installation). *Layout plan of this physical year(2017)checked.—> *Short type(about 1 - 2 m) of DC cable(For 18V) needs 16 cables. *Need machine time —> WDS operating levels are decided by real experiments. === Other site works === * Planned black out: 12/25 === Safety === * Incidents: Dropped the cap of the Type-A BF by 1cm. * Foreseen risks * Type-A: Crane work, vacuum evacuation * Type-B: Crane work * Type-Bp: == Discussion == * Black out preparation * Type-B & Bp (on Monday morning) * Remove DC offset current (shoda) * Put the guardian into the safe state (shoda) * Turn off the coil drivers (aso) * Shutdown the digital systems (miyakawa) * Type-A (X-End) * Okutomi will shutdown the damping control * Mmiyakawa will shutdown the rack * End of the year * Type-B & Bp: put the guardian into the safe state * Type-A: Continue the TF measurements == Travel Plans == * Travel (Week of 12/25): * Takahashi: 26 - 28 * Okutomi: 26 - 28 * Sato: * Ishizaki: * Mark: * Fabian: * Hirata: 26 - 27 * Enzo: * Shoda: 26 - 28 * Ohishi: * Fujii: * Tanaka: * Kozu (ICRR): 26 - 28 * Arai (ICRR): * Travel (Week of 1/9): * Takahashi: 9 - 12 * Okutomi: 9 - 12 * Sato: 9 - 12 * Ishizaki: 9 - 12 * Mark: 9 - 12 * Fabian: 9 - 12 * Hirata: 9 - 12 * Enzo: 9 - 12 * Shoda: 9 - 12 * Ohishi: * Fujii: 9 - 12 ? * Tanaka: * Kozu (ICRR): 9 - 12 ? * Arai (ICRR): == Next meeting == On 2018/1/12(Fri)