Agenda/Minutes of the VIS Meeting on 2018/7/13

2018/7/13 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[X-end]

  • The keystone of F2 has gone to the upper side of bi-stable during the venting.
  • Opened the cross tube and pulled down the filters, but the keystone of F2 (only) did not move.
  • Opened the top chamber and set the height of F0 keystone to 4mm lower by the additional weight.
  • Closed the cross tube and the top chamber to start evacuation.

[Y-front]

  • Calibrated the LVDT in the F2.
  • Measured the transfer function of F2 without additional load. The proper frequency was 0.63Hz
  • Made more compression for the 6 blades. The proper frequency became 0.32Hz.
  • Checked the range of FR. The FR can cover the full range of keystone height.
  • Closed the cup and suspended the filter chain by the crane. The proper frequency changed to 0.40Hz (corresponding to the tuning frequency of 0.28Hz).
  • Cabled around the F2. Checked the cable connections.
  • Confirmed the signals of LVDT for the BF, the F3, and the F2 using the digital system.
  • Lifted down the EQ stop into the corrugate tube. The end plate for F2 sit on the frame lock.
  • Started the assembly of F1 stage. Assembled the end plate and embedded the FR onto the F1.
  • Cabling in the F1.
  • Started the preparation for swapping of IPs.

[X-front]

  • Evaluated the ACCs.

Plan for coming weeks

  • Setting of the F1.
  • Transportation of the IPs from/to the first floor.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • July 26 11:30 - 12:30: Monthly crane inspection
  • Sept 10(Mon): Planned power outage

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Travel Plans

  • Travel (Week of 7/16):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Terrence:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 7/23):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Terrence:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/7/20(Fri)