Line 17: Line 17:

[SRM]
  * Dismounted the top filter for SRM from the IP for Type-A. Packed the IP to the box.
  * Combined the top filter and the IP.

[Y-front]
  * Transported the IPs from/to the first floor.
  * Measured the transfer functions of the BF/F3/F2 by the digital system.
  * Cabled in the F1.
  * Assembled the cup of F1 (Cu plates, connector plates) and closed the cup.
  * Measured the weight of F1.

[X-front]
  * Evaluated the ACCs.
  * Fixed the cables between the cryo-payload (CP) and the BF at the lower points on the wire.
  * Connected the cables to the BF.
  * The CP was installed and suspended from the BF.
  * Adjusted the height of CP. The height of BF was set to 67.5mm.
Line 18: Line 37:
  * Setting of the F1 in Y-front.
  * Setting of the top filter in X-front.

Agenda/Minutes of the VIS Meeting on 2018/7/20

2018/7/20 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[SRM]

  • Dismounted the top filter for SRM from the IP for Type-A. Packed the IP to the box.
  • Combined the top filter and the IP.

[Y-front]

  • Transported the IPs from/to the first floor.
  • Measured the transfer functions of the BF/F3/F2 by the digital system.
  • Cabled in the F1.
  • Assembled the cup of F1 (Cu plates, connector plates) and closed the cup.
  • Measured the weight of F1.

[X-front]

  • Evaluated the ACCs.
  • Fixed the cables between the cryo-payload (CP) and the BF at the lower points on the wire.
  • Connected the cables to the BF.
  • The CP was installed and suspended from the BF.
  • Adjusted the height of CP. The height of BF was set to 67.5mm.

Plan for coming weeks

  • Setting of the F1 in Y-front.
  • Setting of the top filter in X-front.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • July 26 11:30 - 12:30: Monthly crane inspection
  • Sept 10(Mon): Planned power outage

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

  • ETMX F2 status
  • SR2 TF optimal load problem
  • SR cable procurement
  • VIS talk at the F2F in Toyama U
  • VIS introduction page

  • Survey to point out different aspects that should be covered in a introductory lecture for KAGRA.

Travel Plans

  • Travel (Week of 7/23):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Panwei
    • Terrence:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 7/30):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Terrence:
    • Panwei
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/7/27(Fri)