* Checked the stock of OSEMs. 9 of 17 OSEMs are available, but evaluation is necessary. * Confirmed some dimensions on the present OSTM. The height of the breadboards was consistent with the design one. 10mm spacer is necessary. * Ordered the modification parts for the mirror gluing jig and the standoffs. |
Agenda/Minutes of the VIS Meeting on 2019/7/19
2019/7/19 13:30 -
Participants:
Progress report
Type-A
Past week report
- Modified the HPCD for the ETMY TM to increase the current limit from 40 mA to 120 mA, limited by the hardware watchdog.
- The commissioning team was working on the damping filter for ETMY, the guardian for ETMX, and the DC control path.
Plan for coming weeks
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Checked the stock of OSEMs. 9 of 17 OSEMs are available, but evaluation is necessary.
- Confirmed some dimensions on the present OSTM. The height of the breadboards was consistent with the design one. 10mm spacer is necessary.
- Ordered the modification parts for the mirror gluing jig and the standoffs.
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
Travel Plans
- Travel (Week of 7/22):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
- Travel (Week of 7/29):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2019/7/26(Fri)