= Agenda/Minutes of the VIS Meeting on 2019/10/25 = 2019/10/25 14:00 - [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: [[https://paper.dropbox.com/doc/VIS-Commissioning-Task-List--AlK26n6oP8QHU_XUQriwv2PvAg-RKcNXfMFrqOtTAPU48qQf|VIS Commissioning Task List]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] == Progress report == === Type-A === ==== Past week report ==== ==== Plan for coming weeks ==== === Type B === ==== Past week report ==== I diagonalized the ASC degrees of freedom of the beam splitter using the oplev as a first approximation (klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=11165|11165]]). When the wafefront sensor becomes available we will do it again. * Only low frequencies were considered. Actually I used DC offsets. * After the correction, between angular degrees of freedom we achieved 2% coupling when checking with offsets and there was no coherence with length when briefly checking with transfer functions. * Because the coherence decreased at low frequecies after the correction if we want to further reduce the coupling at low frequencies we need to actuate with a line rather than with white noise. * It's still necessary to measure the whole set of crossed transfer functions. ==== Plan for coming weeks ==== * As pointed out above, measure crossed transfer function in the BS. * Do the same with SR suspensions beginning with SRM. === Type-Bp === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM (Takahashi) === ==== Past week report ==== * Assembled the new OSTM suspension using the dummy mirror. At the first time, suspension length was too long by 1cm. It was corrected. ==== Plan for coming weeks ==== * Test of the OSTM suspension is planed in the week of 11/4. === VIS electronics === ==== Past week report ==== ==== Plan for coming weeks ==== === Other site works === === Safety === * Incidents: == Discussion == == Travel Plans == * Travel (Week of 10/28): * Takahashi: * Sato: * Hirata: * Shoda: * Fujii: * Tanaka: * Travel (Week of 11/4): * Takahashi: 5-7 * Sato: 5-7 * Hirata: * Shoda: * Fujii: * Tanaka: == Next meeting == On 2019/11/1(Fri)